• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Beranda » 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi » Maintenance » RCM (Reliability Centered Maintenance): Principle & Software Implementation
zoom preview activate zoom

RCM (Reliability Centered Maintenance): Principle & Software Implementation

Rp 7.950.000
Stok Tersedia
Kategori Maintenance, Production Operation

13 - 15 Juli 2026, Bandung

23 - 25 November, Bandung

Instructors: Ir. Deddy Nugraha & Team

Tentukan pilihan yang tersedia!

RCM (Reliability Centered Maintenance): Principle & Software Implementation

BACKGROUND:

This course teaches the fundamentals of Reliability-Centered Maintenance (RCM). The course gives the participant fundamental tools and knowledge required to participate in any RCM analysis process especially in the gas pipeline industry. Participants will have good practice  in developing and implementing RCM. Theory 30%, and 70% practice.

OBJECTIVES:

After the course participant will have a good understanding of:

  • Asset Reliability Philosophy
  • What is Reliability and How to Measure Asset Reliability
  • Fundamental Reliability Centered Maintenance (RCM)
  • How to evaluate failure consequences
  • How to select preventive maintenance tasks and intervals
  • How to select predictive maintenance tasks and intervals
  • How to select failure finding tasks and intervals
  • Identifying and allocating resources for a RCM program

COURSE OUTLINE:

  1. Asset Reliability Philosophy
  2. What is Reliability and How to Measure Asset Reliability
  3. Fundamental Reliability Centered Maintenance (RCM)
  4. How to evaluate failure consequences
  5. How to select preventive maintenance tasks and intervals
  6. How to select predictive maintenance tasks and intervals
  7. How to select failure finding tasks and intervals
  8. What other function protective actions are available
  9. When run-to-failure is appropriate
  10. How to packaging and implement RCM analysis results
  11. Commercial RCM standards
  12. Various approaches to RCM
  13. RCM terminology
  14. Identifying and allocating resources for a RCM program
  15. Techniques for prioritizing systems for analysis
  16. Use of Weibull and statistical analysis in RCM processes
  17. Packaging and implementing RCM analysis results.
  18. Practical: developing RCM (1 day).

ABOUT THE COURSE LEADER:

Ir. Deddy Nugraha & Team

Ir. Deddy Nugraha is a senior Rotating Engineer & Asset Reliability Specialist. Graduated from Mechanical Engineering Department, ITB (1990), & had advanced training in France and USA, for Gas turbine maintenance and repair. He has extensive experience in RCA & troubleshooting for Turbomachinery Equipment, also Reliability philosophy and SERIP instructor in Chevron- Riau. He is general secretary for Indonesian Reliability Society (ISR) and KMI.

Many consulting works have been conducted including in PT. Indonesia Power (Tambak Loro, Suralaya, Perak), PT. IPMOMI Paiton, and, PT. PGN SBU TSJ and PT. Pertamina Gas, PT. HKS Humpus, and PT. Vale Indonesia. Operational excellence at PGN and railway safety management at the ministry of transportation. Reliability Data collection in Geothermal Power Plant Kamojang.

RCM (Reliability Centered Maintenance): Principle & Software Implementation

Produk Terkait

Technical Project Documentation Management

BACKGROUND: Every good project produces documentation that is well organized and easy to find. Return when information is needed to proceed to the next project phase or operation/maintenance process. It can be done manually although using software is much better. Nevertheless, it is very important that it shall exist & well managed   OBJECTIVES: This…

Rp 5.500.000
Tersedia

Oil Export System Equipment & Operations

BACKGROUND: Export is one of the final end points of an oil and gas production operation where the commodity is about to be delivered to the end Customers. Oil is a flammable commodity and is very sensitive to environmental issues requiring special skills & handling methodology. To get the same understanding of oil commodities the…

Rp 7.950.000
Tersedia
Diskon
13%

Variable Speed Drive

DESKRIPSI: Metode konvensional Throttling Valve (Pencekik Katup) yang diterapkan dalam sistem motor-pompa dengan beban berubah akan mengakibatkan pemborosan konsumsi energi listrik. Variable Speed Drive (VSD) adalah sebuah solusi untuk penghematan energi listrik berbasis teknologi elektronika daya. Keuntungan lain penggunaan VSD adalah dapat meningkatkan fleksibilitas produksi, meningkatkan umur komponen mekanik dan dapat mengatasi permasalahan Motor starting & Motor…

Rp 6.950.000 Rp 7.950.000
Tersedia

Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS)

BACKGROUND: HAZOP means hazard studies (HAZARD) & Operability. It is a systematic method of analysis of the operability parameters deviations using a specific vocabulary. The required documents in order to accomplish the study are the equipment sketches (PID, PFDs) and a process description. HAZID- is a utilized technique for the identification of the significant hazards…

Rp 11.950.000
Tersedia

Perencanaan & Pengendalian Operasi Pembangkit

BACKGROUND: Perencanaan dan pengendalian operasi adalah proses perencanaan kegiatan-kegiatan produksi bertujuan supaya apa yang telah direncanakan dapat terlaksana dengan baik dan sesuai yang diharapkan. Perencanaan operasi adalah aktivitas untuk menetapkan produk yang diproduksi, jumlah yang dibutuhkan, jangka waktu proses kerja produk dan sumber sumber yang dibutuhkan, sedangkan pengendalian operasi adalah aktivitas yang menetapkan kemampuan sumber-sumber…

Rp 7.950.000
Tersedia

API 580 Risk Based Inspection

API 580 – Risk Based Inspection and Maintenance, Repair Background Dalam industri proses berisiko tinggi, kegagalan peralatan seperti pressure vessel, piping, heat exchanger, dan storage tank dapat menimbulkan dampak serius terhadap keselamatan, lingkungan, dan kontinuitas operasi. Pendekatan inspeksi konvensional berbasis waktu (time-based inspection) sering kali tidak efektif dan kurang optimal dari sisi biaya dan risiko….

Rp 7.950.000
Tersedia
Index
Chat with us on WhatsApp
Chat with Us