• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda

Fiqry Jaya Manunggal - Training and Consulting Services

Welcome to PT FIQRY JAYA MANUNGGAL (FJM)

 

Dear Customers,

PT. Fiqry Jaya Manunggal was established in 2001 with variety of services in human resources training. These training programs range from publics to customized in-house training to meet the specific needs of our honored clients. Technical training is our main focus although soft skills, procurement & logistics and other topics are also in our radar.

Over the decade in services, FJM has enlarged the services to consulting services such as architect/fit outgraphic design & printing, and software development. Most of our clients are from oil/gas industries, power generation & mining.

We also serve on providing Health & Safety certification training issued by Kemnaker (Ministry of Human Resources) for both human resources and equipment certification. Such certificate/license has normally 3-years validity where we also serve to take care of such re-certification and extension process.

It is our commitment to provide the best services to Our Clients.

 

Training Terkini

Membangun Kolaborasi Tim yang Solid dan Efektif di Era Hybrid Working

Artikel ini membahas strategi penting untuk membangun kolaborasi tim yang solid dan efektif di tengah tren kerja hybrid. Pelajari cara mengoptimalkan komunikasi, alat, dan budaya tim agar tetap produktif. Dapatkan panduan lengkap untuk sukses dalam lingkungan kerja fleksibel.

*Harga Hubungi CS

Membangun Growth Mindset di Era Perubahan Cepat

Artikel ini membahas pentingnya membangun growth mindset untuk menghadapi tantangan di era perubahan cepat. Temukan strategi praktis untuk beradaptasi, belajar, dan terus berkembang dalam lingkungan yang dinamis. Raih potensi terbaik Anda dengan pola pikir yang tepat.

*Harga Hubungi CS

Design Thinking dalam Engineering Project

Artikel ini membahas secara mendalam penerapan Design Thinking dalam konteks proyek engineering. Pelajari bagaimana pendekatan ini dapat meningkatkan inovasi, memecahkan masalah kompleks, dan mencapai hasil yang lebih efektif. Temukan manfaat utama serta langkah-langkah implementasinya.

*Harga Hubungi CS

Digital Engineering: Transformasi dari CAD ke BIM

Artikel ini membahas evolusi Digital Engineering, dari metode desain tradisional berbasis CAD ke implementasi Building Information Modeling (BIM) yang canggih. Pelajari bagaimana transformasi ini meningkatkan efisiensi dan kolaborasi dalam proyek-proyek modern.

*Harga Hubungi CS

Membangun aplikasi berbasis AI

Artikel ini menyediakan panduan komprehensif tentang cara membangun aplikasi berbasis AI, mulai dari konsep dasar hingga implementasi praktis. Pelajari teknologi kunci dan langkah-langkah penting yang diperlukan untuk mengembangkan solusi AI Anda sendiri.

*Harga Hubungi CS

Maintenance and Reliability Management System

Background Dalam industri modern—terutama migas, pembangkit, petrokimia, dan manufaktur—fungsi maintenance tidak lagi bersifat reaktif, tetapi harus dikelola sebagai sistem manajemen yang terstruktur, berbasis risiko, dan berorientasi keandalan. Maintenance and Reliability Management System (MRMS) merupakan pendekatan terintegrasi yang menghubungkan strategi maintenance, reliability engineering, perencanaan kerja, pengendalian biaya, serta kinerja aset, guna menjamin keberlangsungan operasi, keselamatan, dan profitabilitas…

*Harga Hubungi CS
Tersedia

Supervisi Pengoperasian Sistem BOP (Balance of Plant)

BACKGROUND: Pada pembangkit listrik tenaga uap (PLTU) berbahan bakar batu bara, areanya dikelompokkan menjadi beberapa bagian utama: Main Power Equipment, Balance of Plant (BOP), dan Coal Handling. Secara khusus, Main Power Equipment mencakup boiler, turbin, generator, transformator, dan kondensor. Sementara itu, BOP (Balance of Plant) meliputi beberapa sistem penting seperti Water Treatment Plant (MED, Mixed…

Rp 7.950.000
Tersedia

BFPT Protection and Supervisory System

BFPT (Boiler Feed Pump Turbine) : Protection and Supervisory System Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan…

Rp 6.950.000
Tersedia

Engineering Cost Estimate

BACKGROUND: Definisi Cost Engineering menurut AACE (American Association of Cost Engineer) adalah “suatu bidang engineering, yang meliputi penerapan prinsip-prinsip ilmiah dan teknik, dengan menggunakan pengalaman dan pertimbangan engineering dalam masalah estimasi biaya, pengendalian biaya dan ekonomi teknik“. Pada saat cost engineering belum berkembang perhitungan biaya konstruksi selalu mengalami penyimpangan yang cukup besar. Merespon semua kondisi…

Rp 7.950.000
Tersedia

Engineering Economic Analysis

PENDAHULUAN: Para insinyur, manajer teknik, atau bahkan semua orang akan dihadapkan pada dua lingkungan penting yang saling berkaitan, yaitu lingkungan fisik dan lingkungan ekonomi. Pengetahuan yang baik tentang lingkungan fisik akan banyak mendasari kemampuan seseorang untuk melihat, mengidentifikasi, dan mengendalikan konsep-konsep teknis. Dengan demikian, lingkungan fisik yang ada di sekelilingnya akan bisa digiring pada suatu…

Rp 7.500.000
Tersedia

Rotating Equipment Operation & Maintenance

BACKGROUND: Rotating equipment is commonly used in the industry & plays a vital role in end-to-end production operations. Hence, mastering the principles of rotating equipment is very essential. Identification of failure modes & monitoring methods of failure symptoms are important as well, for establishing the most effective maintenance program. This course begins with discussing the…

Rp 7.950.000
Tersedia

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization

BACKGROUND: Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process. Ideally this includes post start-up review optimization and asset integrity management to…

Rp 7.950.000
Tersedia

Membangun Kolaborasi Tim yang Solid dan Efektif di Era Hybrid Working

Artikel ini membahas strategi penting untuk membangun kolaborasi tim yang solid dan efektif di tengah tren kerja hybrid. Pelajari cara mengoptimalkan komunikasi, alat, dan budaya tim agar tetap produktif. Dapatkan panduan lengkap untuk sukses dalam lingkungan kerja fleksibel.

*Harga Hubungi CS

Flow & Level Custody Measurement

BACKGROUND: This course is designed to acquaint users with the problems and solutions for high accuracy transfer of liquid and gas petroleum products from supplier to customer. These needs have been brought about by major changes in manufacturing processes and because of several dramatic circumstantial changes such as: the increase in the cost of fuel…

Rp 7.950.000
Tersedia

Cathodic Protection, Theory & Practice

BACKGROUND: Successful application and performance of Cathodic Protection (CP) System requires specialized manpower, equipment and recourses. Education is required for understanding basic principles; knowledge and experience are essential for producing desired results in the field. Proper training of personals in the field of cathodic protection is quite difficult and not readily available due to the…

Rp 7.950.000
Tersedia

Uji Persiapan Operasi Pembangkit Listrik Tenaga Termal

BACKGROUND: Operasi pembangkit listrik yang lancar, bebas masalah, dan ekonomis selalu menjadi tujuan utama bagi semua pihak yang bergerak di sektor pembangkitan listrik. Untuk mencapai tujuan tersebut, salah satu kegiatan yang sangat penting adalah memastikan bahwa peralatan utama dan peralatan bantu pembangkit telah dipersiapkan dengan cermat sebelum dimasukkan ke dalam sistem. Proses ini dikenal sebagai…

Rp 7.950.000
Tersedia

Marginal Fields Development

Background: Marginal fields development refers to discoveries which have not been exploited for long, due to one or more of the following factors: • Very small sizes of reserves/pool to the extent of not being economically viable • Lack of infrastructure in the vicinity and profitable consumers • Prohibitive development costs, fiscal levies and or…

*Harga Hubungi CS
Tersedia

Substitution Equipment & Control Relay

BACKGROUND: In modern power generation and industrial systems, ensuring the reliability and continuity of operations is paramount. Substitution Equipment & Control Relay play a critical role in maintaining system integrity, providing backup solutions, and automating essential processes. As equipment ages or technology evolves, it becomes necessary to replace or upgrade these components to avoid system…

Rp 7.950.000
Tersedia

Training Pilihan

Mungkin Anda sedang mencari training berikut ini, cek aja!

Kategori Pilihan

Sekian banyak kategori produk yang ada pada website kami, berikut ini kategori paling spesial

Our Blog

Kami menghadirkan berbagai artikel menarik dan informatif yang dirancang untuk menambah wawasan Anda. Semoga setiap tulisan yang kami sajikan dapat memberikan manfaat dan inspirasi. Selamat membaca!

Inspection Testing dalam FAT

Diposting oleh imam

Inspection dan Testing dalam FAT. Factory Acceptance Test umumnya tidak hanya terdiri dari satu jenis pengujian. Ada beberapa tahapan yang saling melengkapi dimana yang diuji mulai daro dokumentasi teknis, inspeksi, pengujian atas fungsi-fungsi yang diminta, dan uji kinerja. 1. Document Review Sebelum melakukan physical test, dokumen equipment perlu diperiksa. Contohnya: Approved drawings Datasheet Material certificate Calibration…

Selengkapnya
12 Aug

Factory Acceptance Test

Diposting oleh imam

Dalam proyek engineering, procurement, fabrication, dan construction, pembelian equipment bukan sekadar memastikan barang sudah selesai dibuat oleh manufacturer. Equipment tersebut juga harus dipastikan memenuhi spesifikasi teknis, drawing, standard, serta persyaratan yang telah disepakati dalam kontrak. Factory Acceptance Test (FAT) dilakukan untuk memastikan bahwa equipment siap sebelum dikirim ke Site. Di sinilah Factory Acceptance Test (FAT)…

Selengkapnya
10 Aug

Menghitung Cost of Poor Quality (COPQ)

Diposting oleh imam

Konsep COPQ layak dipahami oleh setiap orang.  Kemudian menghitung Cost of Poor Quality (COPQ) perlu diketahui oleh management perusahaan, dengan demikian jika dibutuhkan management tahu apa yang harus dilakukan. Dalam manajemen kualitas, perusahaan sering kali lebih fokus menghitung biaya untuk menghasilkan produk atau jasa yang berkualitas. Namun, ada satu kelompok biaya yang sering luput diperhatikan:…

Selengkapnya
3 Aug

Fiqry Jaya Manunggal - Training and Consulting Services

Fiqry Jaya Manunggal - Training and Consulting Services

Chat with us on WhatsApp
Chat with Us