Fiqry Jaya Manunggal - Training and Consulting Services
Mitra Training Industri Sejak 2001
Public training, in-house training, konsultasi, dan perpanjangan sertifikasi untuk sektor Migas, Tambang, Petrokimia & Pembangkit.
Training Terkini
Factory Acceptance Test Training
Background: Factory Acceptance Test (FAT) adalah tahapan kritis dalam pengadaan peralatan industri yang memastikan bahwa peralatan yang dibeli memenuhi spesifikasi kontrak sebelum dikirimkan ke lokasi proyek. Biaya perbaikan cacat yang ditemukan di pabrik jauh lebih rendah dibandingkan yang ditemukan setelah instalasi. Kompetensi dalam perencanaan, pelaksanaan, dan witnessing FAT sangat penting untuk melindungi investasi peralatan. Objectives:…
Rp 7.950.000
Advance Vibration Analysis
Background: Basic Vibration Training provides just the basic knowledge of vibration, while Advanced Vibration Analysis should have wider spectrums. Some of those wider spectrums are: root-cause analysis/diagnosis & precise corrective recommendations; report writing & recommendation. Participants will be trained not only to recognize vibration symptoms, but to accurately diagnose root causes and provide precise corrective…
Rp 12.950.000
Project Engineering Management
Background: Kompleksitas proyek industri saat ini—khususnya di sektor minyak & gas, petrokimia, pembangkit listrik, dan pertambangan—menuntut integrasi yang sangat presisi antara keahlian rekayasa teknis (engineering) dan kedisiplinan eksekusi proyek (project management). Banyak proyek mengalami kegagalan kinerja bukan karena kesalahan kalkulasi teknis semata, melainkan akibat kurangnya jembatan yang kuat (interface) antara tim engineering dengan fungsi procurement,…
Rp 7.950.000
Supervisi Pengoperasian Sistem BOP (Balance of Plant)
BACKGROUND: Pada pembangkit listrik tenaga uap (PLTU) berbahan bakar batu bara, areanya dikelompokkan menjadi beberapa bagian utama: Main Power Equipment, Balance of Plant (BOP), dan Coal Handling. Secara khusus, Main Power Equipment mencakup boiler, turbin, generator, transformator, dan kondensor. Sementara itu, BOP (Balance of Plant) meliputi beberapa sistem penting seperti Water Treatment Plant (MED, Mixed…
Rp 7.950.000BFPT Protection and Supervisory System
BFPT (Boiler Feed Pump Turbine) : Protection and Supervisory System Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan…
Rp 6.950.000
Engineering Cost Estimate
BACKGROUND: Definisi Cost Engineering menurut AACE (American Association of Cost Engineer) adalah “suatu bidang engineering, yang meliputi penerapan prinsip-prinsip ilmiah dan teknik, dengan menggunakan pengalaman dan pertimbangan engineering dalam masalah estimasi biaya, pengendalian biaya dan ekonomi teknik“. Pada saat cost engineering belum berkembang perhitungan biaya konstruksi selalu mengalami penyimpangan yang cukup besar. Merespon semua kondisi…
Rp 7.950.000
Safety Instrumented System (SIS) and Control
BACKGROUND: Process safety is a critical element in industries involving high-risk operations, such as oil and gas, petrochemicals, and manufacturing. One of the main components in process safety management is the Safety Instrumented System (SIS). Safety Instrumented System (SIS) and Controls is designed to protect personnel, the environment, and assets from potential incidents that can…
Rp 7.950.000
Rotating Equipment & Machineries
BACKGROUND: Rotating equipment & machineries, or turbomachinery, involves a component that transfers energy between working fluids and the machine. This transfer can occur from the rotor to the fluid, making it a pump or a fan, or from the fluid to the rotor, making it a turbine. Examples of such machinery include fans, pumps, compressors,…
*Harga Hubungi CS
Business Continuity Management
BACKGROUND: In today’s fast-paced and interconnected world, businesses face an array of challenges, from natural disasters to cyberattacks and global pandemics. Business Continuity Management (BCM) is a critical discipline that helps organizations identify potential threats and mitigate their impact. By implementing a structured BCM framework, businesses can ensure that critical operations continue to function during…
Rp 7.950.000Training Pilihan
Mungkin Anda sedang mencari training berikut ini, cek aja!
Kumpulan Artikel
Kami menghadirkan berbagai artikel menarik dan informatif yang dirancang untuk menambah wawasan Anda. Semoga setiap tulisan yang kami sajikan dapat memberikan manfaat dan inspirasi. Selamat membaca!
Menguasai Pipeline Design Engineering: Kunci Sistem Pipa yang Andal dan Efisien
Pipeline design engineering adalah disiplin krusial dalam industri energi dan proses. Artikel ini membahas prinsip dasar, tahapan, dan pentingnya perancangan sistem pipa yang optimal.
Inspeksi Harian Alat Berat: Checklist, Prosedur, dan Kesalahan yang Sering Terlewat
Inspeksi harian alat berat adalah pengeluaran paling murah dan paling sering dilewati di operasi tambang. Sepuluh menit berkeliling unit sebelum shift dimulai bisa mencegah kebocoran hidraulik yang berujung pada kebakaran, ban yang pecah di jalan angkut, atau track yang lepas di tengah front. Sebaliknya, satu kelalaian kecil di checklist pagi hari sering berakhir sebagai downtime…
Pipeline Design & Engineering
Pelajari Pipeline Design & Engineering secara mendalam. Artikel ini membahas rute pipa, hidrolika, analisis tegangan, material, standar ASME, ISO, hingga pemodelan 3D.
