• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Beranda » Training » Oil & Gas » Marginal Fields Development
zoom preview activate zoom

Marginal Fields Development

Stok Tersedia
Kategori Oil & Gas, Training
Tentukan pilihan yang tersedia!
INFO HARGA
Silahkan menghubungi kontak kami untuk mendapatkan informasi harga produk ini.

Marginal Fields Development

Background:

Marginal fields development refers to discoveries which have not been exploited for long, due to one or more of the following factors:

• Very small sizes of reserves/pool to the extent of not being economically viable
• Lack of infrastructure in the vicinity and profitable consumers
• Prohibitive development costs, fiscal levies and or technological constraints

The various cycles which affect our oil industry have emphasised the need for detailed control of expenditure for development and production of such small discoveries. However, should technical or economic conditions change, such fields may become commercial fields. Marginal fields have several parameters that affect them. This includes environmental concerns, political stability, access, remoteness and, of course, the price and price stability of the produced gas/liquids.

This course will describe parts of unconventional methods to develop the marginal fields and mainly focus on innovative methods and new technology in developing those marginal fields.

Objectives:

The objectives of Marginal Fields Development training are:

• Recognise production & reservoir characteristics of marginal fields.
• Recognize the unique production & reservoir characteristics that define marginal fields & differentiate them from larger, more developed oil & gas assets.
• Understand the Improved Recovery Methods
• Understand the appropriate application of IOR (Improved Oil Recovery) methods to enhance production & maximize the economic potential of marginal fields.
• Identify under-performing wells or field areas & recommend appropriate intervention
• Determine the “upside potential” of a field, distinguishing between incremental reserves & reserve acceleration
• Describe the unconventional methods of developing marginal fields
• Describe all new technologies applied on the marginal fields

Course Outline

  • Definition of marginal field development
  • Why opportunities emerge; nature of reserves growth; operating practices and their effect on new opportunities; the contribution of evolving technology
  • Recognising opportunities, reservoir characteristics & production performance indicative of new opportunities, unravelling limited data and linking operator practices to new opportunities
  • Novel wells for increased production rates, improved recovery and reduced cost
  • Innovative facilities solutions to reduce capital & operating costs for marginal fields
  • New technology/ the future of marginal fields
  • Production optimization techniques that involve types of wells, well completions, artificial lift, stimulation methods, matrix stimulation & hydraulic fracturing methods
  • IOR and new technology; water injection/flooding; polymer flooding/ bright water and gas injection
  • Case studies and possibility of new technology applications for various fields:
    o PHR
    o PHM
    o PHE-ONWJ
    o PHE-OSES
    o PHE-WMO
  • Conclusions and final review

About The Course Leader
FJM’s Associate Instructors

Marginal Fields Development

Produk Terkait

Coal Dust Explosion

Background & Objectives: Coal dust explosion is one of the most hazardous risks in coal-fired power plants & coal handling facilities. Fine coal particles are highly combustible & under certain conditions, can lead to catastrophic explosions when exposed to ignition sources. The risk becomes even more critical as operations scale up & involve large quantities…

Rp 6.350.000
Tersedia

Well Completion and Workover

BACKGROUND: Well Completion and Workover are two activities in oil and gas industry, regardless it is oil or gas wells. Initial completion is the activities to allow production fluid to flow into the well bore and eventually flow to surface facilities. Workover carried out when the oil or gas production start declining overtime. Hence as…

Rp 13.950.000
Tersedia

Wells Stimulation

BACKGROUND Often in today’s dynamic oil and gas industry, not enough attention is paid to the details of wells stimulation treatments. This can result in poor and/or less than optimum results. Production and Reservoir Engineers involved in the planning, execution, evaluation & monitor well performance. They need to know more about well stimulation so can…

Rp 9.950.000
Tersedia

Gas Production Optimization

BACKGROUND: Dalam training Gas Production Optimization, instruktur akan membawa peserta untuk memahami pertimbangan dalam mendesain dan memilih metoda operasi produksi sumur gas, mulai dari Reservoir, Wellhead, Separator, Gas Processing, Pompa, Pipa Pipa hingga ke Gas Metering. Peserta akan belajar teori, aplikasi dan perhitungan, mulai dari dasar Reservoir Engineering, Production Engineering, kemudian mengenal Gas Properties, Peralatan…

Rp 14.950.000
Tersedia

Pengukuran & Alat Ukur Listrik Pembangkit

BACKGROUND: Pengukuran dan alat ukur listrik memiliki peran krusial dalam memastikan keandalan dan efisiensi operasi pembangkit listrik. Alat ukur ini digunakan untuk memantau parameter penting seperti tegangan, arus, daya, dan frekuensi, yang berdampak langsung pada kinerja sistem. Pemahaman yang baik tentang prinsip kerja dan aplikasi alat ukur listrik sangat penting bagi teknisi dan operator dalam…

Rp 7.950.000
Tersedia

Project Management Using MS Project

LATAR BELAKANG Aktivitas proyek dapat terjadi di segala bidang di perusahaan, baik proyek fisik (infrastruktur) seperti proyek pembelian peralatan, pemasangan fasilitas, pendirian pabrik baru maupun non fisik seperti proyek pengembangan produk baru,perancangan struktur organisasi, pembuatan sistem informasi manajemen dan peningkatan produktivitas perusahaan. Realitas di lapangan menunjukkan bahwa sering terjadi kegagalan dalam menjalankan proyek disebabkan oleh…

Rp 7.950.000
Tersedia