- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Well Completion and Workover
Rp 13.950.000| Stok | Tersedia |
| Kategori | 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi, Oil & Gas |
Trainer: Prof. Herianto, Ir., M.Sc., Ph.D.
Jogjakarta, 13-16 October, 2025
Well Completion and Workover
BACKGROUND:
Well Completion and Workover are two activities in oil and gas industry, regardless it is oil or gas wells. Initial completion is the activities to allow production fluid to flow into the well bore and eventually flow to surface facilities. Workover carried out when the oil or gas production start declining overtime. Hence as it is said, Workover done over and over. Well completion normally done once in a life time of an oil/gas well. However, workover done almost regularly when Production Engineer see the posibility to improve production rate.
Oil and gas activities involve high capital investment and high risk as the operation deals with flame able fluids, high pressure and high temperature. Therefore, whoever involve in the activities must be knowledgeable, qualified ones and better to have enough experience. However, in fact not all people involved have enough prerequisite to do the job. As such, supplementary training should probably be required to ensure the activities carried in safe, technically sound and environment friendly.
OBJECTIVES:
After attending this training participants expected to:
- Understand correct prosedur and technique of well completion dan workover
- Recognize and familiar with equipment related to workover and well completion
- Undestand technique and function of well stimulation
- Analysis well problem and give the right solutions
- Improve well flow performance
- Design workover and well completion
- Analisa completion and workover results
TRAINING CONTENT:
- Basics of Production Techniques: Reservoir flow energy, Oil well production testing, Gas well production testing
- Well Completion Practices: Types of well completion, Interval selection and productivity considerations
- Downhole Production Equipment: Tubular products, Packers, Circulating devices, Nipples, Blast joint and flow coupling, Telescopic swivel joints, Subsurface Safety Valves, Artificial lift equipment, Wellhead Assemblies
- Perforating: Shaped charges, Industry testing procedures, Gun categories, Specialized equipment and operation, Casing deformation/damage, Perforation productivity considerations, Field completion considerations, Wellhead pressure control, Depth control technique
- Production Problems
- Sand Control: Basic technology, Control methods, Program engineering
- Types of workovers: Full-bore, Thru- tubing
- Workover equipment: Rigs, Hydraulic (Snubbing) Units, Coiled tubing
- Workover fluids selection
- Hydraulic fracturing
- Acidizing
- Acid-Hydraulic Fracturing
- Corrosion, Scale, and Paraffin Removal
- Changing of Production Zones
- Leak Detection and Isolation
- Economic Analysis and Decision
WHO SHOULD ATTEND:
- Drilling Team: Engineer, Superintendent, Supervisor
- Well Services team: Rig Manager, Service Company Drilling, Rig Supervisor
- Petroleum Engineering Team: Workover engineer, Production Engineer, Production superintendent, Production Supervisor, Senior Operator
- HSE Supervisor, and Maintenance Supervisor.
TRAINER:
Prof. Herianto, Ir., M.Sc., Ph.D.
Anda mungkin suka:
Well Completion and Workover
Flow Assurance for Pipeline System
BACKGROUND: This course will provide an understanding of flow phenomena that can help the participants avoid problems such as hydrate formation, pressure (surge) waves, or high viscosity liquid flow failure. This intensive, four-day intermediate level course addresses several critical problems in achieving pipeline flow assurance. The focus of this course is on potential challenges to…
Rp 7.950.000
Oil & Gas Surface Facilities and Measuring System
PENDAHULUAN: Industri minyak dan gas mencakup aktifitas yang sangat luas, sejak tahap eksplorasi sampai dengan eksploitasi serta melibatkan disiplin ilmu yang sangat kompleks. Yang kasat mata adalah kegiatan di atas permukaan (oil & gas surface facilities and measuring system). Karena sifat minyak/gas yang mudah terbakar, maka diperlukan tenaga berkompeten untuk menanganinya. Satu disiplin ilmu saja…
Rp 14.950.000
Teknik dan Metode Penyususan HPS/OE, Untuk Pengadaan Barang & Jasa serta Project Management
BACKGROUND: Harga Perkiraan Sendiri (HPS) atau Owner Estimate (OE) adalah sebuah acuan penting dalam proses pengadaan barang, jasa, maupun proyek. HPS/OE disusun melalui analisis profesional dan disahkan oleh pihak berwenang untuk menjadi dasar dalam menilai kewajaran harga penawaran. Karena itu Teknik Pembuatan HPS/ OE dapat memastikan harga yang ditetapkan oleh penyedia sesuai dengan standar yang…
Rp 7.950.000
Asset Integrity Management System (AIMS)
BACKGROUND: Asset Integrity Management Systems (AIMS) outline the ability of an asset to perform its required function effectively and efficiently whilst protecting health, safety and the environment and the means of ensuring that the people, systems, processes and resources that deliver integrity are in place, in use and will perform when required over the whole…
Rp 7.950.000
Desain & Pemasangan PLTS
BACKGROUND: Pembangkit Listrik Tenaga Surya (PLTS) – Merupakan suatu fasilitas atau sistem yang mengubah energi matahari menjadi energi listrik. PLTS menggunakan teknologi fotovoltaik untuk menangkap sinar matahari dan mengubahnya menjadi arus listrik secara langsung melalui efek fotolistrik pada sel surya. Ini adalah salah satu bentuk energi terbarukan yang semakin populer karena sumber energi matahari yang…
Rp 7.950.000
Integrated Reservoir Management
Background: Integrated Reservoir Management (IRM) is a structured approach to maximize the value of hydrocarbon assets by combining G&G, Reservoir Engineering, Drilling, Completion, Production, and Economic considerations into a single framework. Through effective integration of data and disciplines, operators can improve recovery factors, extend field life, and optimize development plans. This is where “Integrated” play…
Rp 10.950.000
>



