- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Well Completion and Workover
Rp 13.950.000| Stok | Tersedia |
| Kategori | 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi, Oil & Gas |
Trainer: Prof. Herianto, Ir., M.Sc., Ph.D.
Jogjakarta, 13-16 October, 2025
Well Completion and Workover
BACKGROUND:
Well Completion and Workover are two activities in oil and gas industry, regardless it is oil or gas wells. Initial completion is the activities to allow production fluid to flow into the well bore and eventually flow to surface facilities. Workover carried out when the oil or gas production start declining overtime. Hence as it is said, Workover done over and over. Well completion normally done once in a life time of an oil/gas well. However, workover done almost regularly when Production Engineer see the posibility to improve production rate.
Oil and gas activities involve high capital investment and high risk as the operation deals with flame able fluids, high pressure and high temperature. Therefore, whoever involve in the activities must be knowledgeable, qualified ones and better to have enough experience. However, in fact not all people involved have enough prerequisite to do the job. As such, supplementary training should probably be required to ensure the activities carried in safe, technically sound and environment friendly.
OBJECTIVES:
After attending this training participants expected to:
- Understand correct prosedur and technique of well completion dan workover
- Recognize and familiar with equipment related to workover and well completion
- Undestand technique and function of well stimulation
- Analysis well problem and give the right solutions
- Improve well flow performance
- Design workover and well completion
- Analisa completion and workover results
TRAINING CONTENT:
- Basics of Production Techniques: Reservoir flow energy, Oil well production testing, Gas well production testing
- Well Completion Practices: Types of well completion, Interval selection and productivity considerations
- Downhole Production Equipment: Tubular products, Packers, Circulating devices, Nipples, Blast joint and flow coupling, Telescopic swivel joints, Subsurface Safety Valves, Artificial lift equipment, Wellhead Assemblies
- Perforating: Shaped charges, Industry testing procedures, Gun categories, Specialized equipment and operation, Casing deformation/damage, Perforation productivity considerations, Field completion considerations, Wellhead pressure control, Depth control technique
- Production Problems
- Sand Control: Basic technology, Control methods, Program engineering
- Types of workovers: Full-bore, Thru- tubing
- Workover equipment: Rigs, Hydraulic (Snubbing) Units, Coiled tubing
- Workover fluids selection
- Hydraulic fracturing
- Acidizing
- Acid-Hydraulic Fracturing
- Corrosion, Scale, and Paraffin Removal
- Changing of Production Zones
- Leak Detection and Isolation
- Economic Analysis and Decision
WHO SHOULD ATTEND:
- Drilling Team: Engineer, Superintendent, Supervisor
- Well Services team: Rig Manager, Service Company Drilling, Rig Supervisor
- Petroleum Engineering Team: Workover engineer, Production Engineer, Production superintendent, Production Supervisor, Senior Operator
- HSE Supervisor, and Maintenance Supervisor.
TRAINER:
Prof. Herianto, Ir., M.Sc., Ph.D.
Anda mungkin suka:
Well Completion and Workover
Basic Process Safety for Operation Personnel
Background Industri proses seperti migas, petrokimia, pembangkit, dan manufaktur kimia memiliki potensi bahaya tinggi akibat penggunaan fluida berbahaya, tekanan dan temperatur tinggi, serta sistem operasi yang kompleks. Banyak kecelakaan besar di industri proses terjadi bukan hanya karena kegagalan peralatan, tetapi juga akibat kurangnya pemahaman personel operasi terhadap prinsip dasar process safety. Process safety berbeda dengan…
Rp 7.950.000
Hydraulic Fracturing
Hydraulic Fracturing (HF) is a reservoir stimulation to enhance oil and gas well productivity. In addition to its application in low-permeability formations, HF is also essential when formation damage occurs during drilling or when productivity declines due to water intrusion and other factors. This technology has become a critical component in the development of both…
Rp 13.000.000
Power Plant Performance Test
BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…
Rp 7.950.000
PSC Business & Profit Sharing Funds
Background: Production Sharing Contract (PSC) is the most widely used contractual framework in the oil and gas industry to regulate the relationship between host governments and contractors. Under this scheme, in the upstream oil & gas business Government retains ownership of natural resources, while contractors are entitled to recover costs and share profits according to…
Rp 14.950.000
Lifting Operation Oil & Gas
BACKGROUND: Lifting operation adalah usaha yang dilakukan oleh production engineer dan tim production engineer untuk mengangkat minyak dan gas dari dasar sumur ke permukaan, baik melalui sumur sumur alam (natural flow) mau pun sumur – sumur buatan (artificial lift). Biasanya artificial lift yang sering digunakan adalah Gas Lift well, Sucker Rod Pump well, Electric Submersible…
Rp 14.950.000
Produced Water Management
Background: Produced water merupakan fluida dengan volume terbesar yang dihasilkan dalam operasi minyak dan gas. Seiring meningkatnya usia lapangan, rasio produced water terhadap hydrocarbon cenderung meningkat dan menimbulkan tantangan teknis, lingkungan, serta biaya operasi yang signifikan. Dengan demikian Produced Water Management menjadi isu teknis, lingkungan, dan ekonomi yang kritikal. Pengelolaan produced water yang efektif membutuhkan…
Rp 7.950.000
>