• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
zoom preview activate zoom

Gas Production Optimization

Rp 14.950.000
Stok Tersedia
Kategori Engineering, Oil & Gas, Production Operation

14 -17 April 2026, Bandung

01 -04September 2026, Bandung

05 -08 Oktober 2026, Bandung

TRAINER: Prof. Dr.-Ing. Bonar Tua Halomoan Marbun

Tentukan pilihan yang tersedia!

Gas Production Optimization

BACKGROUND:

Dalam training Gas Production Optimization, instruktur akan membawa peserta untuk memahami pertimbangan dalam mendesain dan memilih metoda operasi produksi sumur gas, mulai dari Reservoir, Wellhead, Separator, Gas Processing, Pompa, Pipa Pipa hingga ke Gas Metering. Peserta akan belajar teori, aplikasi dan perhitungan, mulai dari dasar Reservoir Engineering, Production Engineering, kemudian mengenal Gas Properties, Peralatan untuk memproduksikan Gas bumi, Desain Pipa, dan penyelesaian masalah produksi.

Peserta training akan belajar bagaimana batuan reservoir, porositas, permeabilitas, dan sifat fluida diukur di laboratorium, dan bagaimana sifat fluida mempengaruhi aliran fluida di reservoir sampai ke permukaan menuju pemakai.

Training ini akan membahas cara testing sumur gas melalui Pressure Build-up Test, Drawdown Test, dan cara gas well testing lainnya. Training ini dilengkapi dengan berbagai contoh kasus di lapangan. Prof Herianto sudah mengajar kursus ini bertahun-tahun dan materi training ini terus diperbarui dan ditingkatkan. Akhirnya, dengan mengikuti training ini peserta akan mampu memproduksikan gas bumi dengan lebih optimum.

OBJECTIVES:

  1. Reservoir and Resource Understanding
  2. Technical Knowledge in Production
  3. System Optimization
  4. Field Management and Strategy
  5. Operational Excellence

COURSE OUTLINE:

  1. Reservoir Minyak dan Gas bumi
  2. Peramalan Cadangan dan Decline Curve
  3. Dasar-dasar Teknik Produksi
  4. Sifat Fisik Gas
  5. Gas Processing
  6. Gas Piping System
  7. Kompresor dan Pompa
  8. Measurement of Natural Gas and Liquid
  9. Gas Measurement under AGA
  10. Operasi Pigging
  11. Interaksi Fluida dan Batuan
  12. Water injection
  13. Pengelolaan lapangan gas

ABOUT THE COURSE LEADER:

Prof. Dr.-Ing. Bonar Tua Halomoan Marbun

Gas Production Optimization

Produk Terkait

Vibration Analysis Methodology

BACKGROUND: This training is currently provided to teach the techniques and skills needed to perform Vibration Analysis in the shortest time and to increase awareness of its importance. Extensive teaching techniques and skills required to perform vibration in three-days “hands on” to increase knowledge to achieve the smooth-running machinery. You will learn how to analyze…

Rp 9.950.000
Tersedia

Supervisi Pengoperasian Sistem BOP (Balance of Plant)

BACKGROUND: Pada pembangkit listrik tenaga uap (PLTU) berbahan bakar batu bara, areanya dikelompokkan menjadi beberapa bagian utama: Main Power Equipment, Balance of Plant (BOP), dan Coal Handling. Secara khusus, Main Power Equipment mencakup boiler, turbin, generator, transformator, dan kondensor. Sementara itu, BOP (Balance of Plant) meliputi beberapa sistem penting seperti Water Treatment Plant (MED, Mixed…

Rp 7.950.000
Tersedia

Wells Performance & Surveillance

BACKGROUND: Effective monitoring and surveillance of well performance are critical to optimizing production, identifying operational inefficiencies, and maintaining the integrity of wells over time. Wells Performance & Surveillance is a comprehensive approach that involves the collection, analysis, and interpretation of data from wells to improve performance and decision-making. This training provides participants with the knowledge…

Rp 13.950.000
Tersedia

Sand Control Management

BACKGROUND: In oil & gas production, sand production remains a critical issue can significantly impact equipment integrity, production efficiency, & overall operational safety. If not properly managed, produced sand can lead to severe erosion of equipment, flow restrictions, & even complete system failures. Hence, effective sand control management is essential to ensuring long-term well productivity…

Rp 10.950.000
Tersedia

Integrated Production Optimization

Background & Objectives: A production system is the system that transports reservoir fluid from the subsurface to the surface and separates it into oil, gas, and water. From there the oil and gas streams are treated if necessary and prepared for sale or transport from the field. Any water produced will also treated and prepared…

Rp 8.950.000
Tersedia

Pemantauan Pengelolaan Limbah Bahan Berbahaya Dan Beracun

BACKGROUND: Sertifikasi BNSP – Pemantauan Pengelolaan Limbah Bahan Berbahaya Dan Beracun Pencemaran limbah B3 dari aktivitas industri merupakan Pemerintah telah mengeluarkan aturan baru pengolahan limbah bahan berbahaya dan beracun (B3) dan non-B3. Aturan tersebut tercantum dalam Peraturan Pemerintah Nomor 22 Tahun 2021 tentang Penyelenggaraan Perlindungan dan Pengelolaan Lingkungan Hidup. PP ini merupakan salah satu turunan…

Rp 8.950.000
Tersedia
Chat with us on WhatsApp
Chat with Us