- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Economics & Commercial Aspects of POD
Rp 14.950.000| Stok | Tersedia |
| Kategori | Manajemen, Oil & Gas |
Trainer: Benny Lubiantara - Field Practitioner
Bandung, 22-24 July, 2026
Bandung, 23-25 September, 2026
Economics & Commercial Aspects of POD
Background:
Plan of Development (POD) of oil & gas fields represents a very complex problem and involves huge amounts of investments. POD is also one of the main business processes in Indonesia PSC besides Work Program & Budget (WP&B) and Authorization for Expenditure (AFE). Understand POD mechanism is very importance for anyone working on oil & gas industry.
This Course covers extensive discussion on how to evaluate the economics of oil & gas developments. The PSC economic modeling using Excell will be provided to ensure that the participants not only become familiar with the PSC economics but also their implications to the overall project economics both from Government and Contractor perspectives.
Objectives:
- Memahami peran POD dalam skema bisnis PSC Indonesia.
- Menjelaskan elemen utama ekonomi & komersial POD (cost recovery, FTP, DMO, insentif, ring fence).
- Melakukan evaluasi ekonomi proyek hulu migas berbasis CAPEX, OPEX, dan produksi.
- Menganalisis dampak keputusan teknis & komersial terhadap NPV, IRR, payout, dan government take.
- Memahami prinsip PSC economic modeling untuk pengambilan keputusan investasi.
- Mengaplikasikan Excel-based POD economic model untuk analisis skenario dan sensitivitas.
Recommended Participants:
• Corporate Planning Managers/Offices
• Commercial Managers Managers/Offices
• Business Development & Venture
• Geosciences
• Petroleum Engineers
• Engineers (Project, Planning, Maintenance & Operation)
• Finance, Legal, Liasson Support Officers
• Anybody interests in improving skills on Economics & Commercial aspects of POD
Course Outline:
Understanding PSC Indonesia
• Upstream Petroleum Contracts
• Booking Reserves Mechanism
• Economics Analysis of Upstream Project
• Flow Chart for Calculating the PSC Economics
Understanding the Economic of Plan of Development (POD)
• POD Mechanism
• Economics & Commercials Aspect of Indonesia PSC
• Cost Recovery, FTP, DMO, Incentives package, Ring Fences, Block Basis Vs POD Basis, etc
• Special Topic: Real Classes Study in Economic Evaluation POD’s
POD & Economics Modelling using Excell (Class Exercise)
• Last day is dedicated to the application of Excell spreadsheet to run the economics of POD.
The Course Leader:
Benny Lubiantara
Economics & Commercial Aspects of POD
Applied Reservoir Engineering
BACKGROUND: Petroleum Engineering practically covers: Production Operation, Drilling, and the core (Reservoir Engineering). This training represents the core of the reservoir engineering program. Numerous engineering practices are covered from fluid & rock properties to simulation & field development planning. As the core, Reservoir Department is the only one that normally cares about the live time…
Rp 10.950.000
Comprehensive PSC Accounting
BACKGROUND: The oil and gas industry operates within a highly complex and dynamic regulatory environment, significantly shaped by changes in Production Sharing Contracts (PSC) and legislative reforms. The shift from the traditional Cost Recovery model to the Gross Split scheme has introduced new challenges and opportunities in accounting practices, fiscal management, and operational strategies. Due…
Rp 14.500.000
RAM (Reliability, Availability, and Maintainability)
BACKGROUND: Studi RAM digunakan sebagai cara untuk menilai kemampuan sistem produksi (plant), baik yang beroperasi maupun yang masih dalam fase desain. Karena fasilitas & plant digunakan untuk jangka waktu yang lebih lama, Studi Reliability, Availability, dan Maintainability mampu memberikan assessment ke dalam asset life time capabilities & memungkinkan bisnis untuk memaksimalkan laba atas investasi. RAM…
Rp 7.950.000
Flow & Level Custody Measurement
BACKGROUND: This course is designed to acquaint users with the problems and solutions for high accuracy transfer of liquid and gas petroleum products from supplier to customer. These needs have been brought about by major changes in manufacturing processes and because of several dramatic circumstantial changes such as: the increase in the cost of fuel…
Rp 7.950.000
Power Plant Performance Test
BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…
Rp 7.950.000
Lock Out Tag Out (LOTO)
BACKGROUND: Tag Out & Lock Out (LOTO) adalah prosedur keselamatan kerja yang bertujuan untuk melindungi pekerja dari potensi bahaya akibat pelepasan energi yang tidak terduga saat melakukan perawatan atau perbaikan peralatan. LOTO tidak hanya berlaku untuk tim Electrical, tetapi juga penting bagi tim Production, Operation, Maintenance, dan Instrument, karena setiap sistem dalam industri Oil &…
Rp 7.950.000
>