- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization
Rp 7.950.000| Stok | Tersedia |
| Kategori | Engineering, Maintenance, Oil & Gas, Production Operation, Project |
17 - 19 Juni 2026, Bandung
13 - 15 Oktober 2026, Bandung
09 - 11 Desember 2026, Bandung
Trainer: Ir. Agus Ibrahim - Practitioner
Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization
BACKGROUND:
Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process.
Ideally this includes post start-up review optimization and asset integrity management to ensure asset availability and reliability. This advance session is designed to cover not only technical aspects such as design but also include other construction/contract management and asset management.
OBJECTIVES:
After attending this training, participants will gain:
- Understanding on basic codes & regulations
- Ensure sitting & route of the facilities comply to the requirements
- Apply mechanical & physical principles to piping, hydraulics and material selection
- Apply mechanical & physical principles to rotating equipment
- Apply Safety in Design Principle
- Identify special design constraint in on-shore facilities
- Ability to perform post commissioning review & recommend improvements
- Operation & Asset Integrity Management best practices
RECOMMENDED PARTICIPANTS:
Process, Pipe line & Project Engineers, Operation & Maintenance Supervisors, Regulatory & Compliance and others who intent to enrich the skill sets with experiences in O/G industries for several years.
This training is intended to those want to expands the understanding starting to planning, constructions, start-up, post production and asset management of on-shore O/G facilities.
COURSE OUTLINE:
- Overview of codes & regulations
- Overview of Feasibility Study
- Site Survey & RoW (Right of Way) determination
- Mechanical and process design
- System Sizing and design
- Equipment selection criteria
- Overview of Safety in Design
- Construction stages and contract management
- Post production design review and optimization
- Operation & Asset Integrity/reliability Management
ABOUT THE COURSE LEADER:
Ir. Agus Ibrahim, Experienced with years of exemplary project management and contract in Oil & Gas infrastructure as well as mining/mineral infrastructure with an emphasis on scope, schedule, quality and HSE requirements to the best industry practice for engineering, fabrication and construction. Understandings critical requirements of both greenfield and brownfields project development from concept to execution. Passionate about manages and integrate of widely diverse technical and multi-cultural teams.
Excellent administration and management skills, including strategic planning, leadership, resource allocation, coordinating staff, exceptional critical thinking and analytical skills.
Well understand the project needs of both Contractor’s perspective and Company’s project life cycle perspective.
Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization
API 580 Risk Based Inspection
API 580 – Risk Based Inspection and Maintenance, Repair Background Dalam industri proses berisiko tinggi, kegagalan peralatan seperti pressure vessel, piping, heat exchanger, dan storage tank dapat menimbulkan dampak serius terhadap keselamatan, lingkungan, dan kontinuitas operasi. Pendekatan inspeksi konvensional berbasis waktu (time-based inspection) sering kali tidak efektif dan kurang optimal dari sisi biaya dan risiko….
Rp 7.950.000
Spare Parts Management
BACKGROUND: Spare parts management yang baik ibarat kelengkapan logistic dalam suatu pertempuran. Tahukah berapa kerugian yang diakibatkan karena kerusakan mesin atau peralatan yang tak terduga saat proses produksi berlangsung? Kemudian bagaimana jika proses perbaikan yang dilakukan terganggu karena ketiadaan spare part? Tidak hanya kerugiaan akibat loss production yang dapat dihitung, mungkin kerugian yang tak dapat…
Rp 7.950.000
Power Plant Performance Test
BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…
Rp 7.950.000
Asset Integrity Management System (AIMS)
BACKGROUND: Asset Integrity Management Systems (AIMS) outline the ability of an asset to perform its required function effectively and efficiently whilst protecting health, safety and the environment and the means of ensuring that the people, systems, processes and resources that deliver integrity are in place, in use and will perform when required over the whole…
Rp 7.950.000
Pemeliharaan Prediktif Pembangkit
BACKGROUND: Setelah mengikuti pelatihan ini peserta diharapkan faham menganai predictive maintenance pada mesin dan peralatan pembangkit, yang merupakan strategi perawatan dengan pelaksanaan yang didasarkan kondisi mesin/ peralatan itu sendiri atau berdasarkan kondisi (condition based maintenance) dan monitoring kondisi mesin/peralatan (machinery condition monitoring) sebagai penentuan kondisi mesin/peralatan pembangkit dengan cara pemeriksaan secara rutin sehingga dapat diketahui…
Rp 7.950.000
Programmable Logic Controller (PLC) Principle, Practice & Trouble Shooting
BACKGROUND: Programmable Logic Controller (PLCs) are integral to modern industrial automation systems. They control machinery and processes in industries such as manufacturing, oil and gas, automotive, and food production. A PLC consists of hardware and software designed to automate processes that require high reliability, ease of programming, and robustness to environmental factors. As industries increasingly rely…
Rp 7.950.000
>