• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Beranda » 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi » Engineering » Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization
zoom preview activate zoom

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization

Rp 7.950.000
Stok Tersedia
Kategori Engineering, Maintenance, Oil & Gas, Production Operation, Project

17 - 19 Juni 2026, Bandung

13 - 15 Oktober 2026, Bandung

09 - 11 Desember 2026, Bandung

Trainer: Ir. Agus Ibrahim - Practitioner

Tentukan pilihan yang tersedia!

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization

BACKGROUND:

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process.

Ideally this includes post start-up review optimization and asset integrity management to ensure asset availability and reliability. This advance session is designed to cover not only technical aspects such as design but also include other construction/contract management and asset management.

OBJECTIVES:

After attending this training, participants will gain:

  • Understanding on basic codes & regulations
  • Ensure sitting & route of the facilities comply to the requirements
  • Apply mechanical & physical principles to piping, hydraulics and material selection
  • Apply mechanical & physical principles to rotating equipment
  • Apply Safety in Design Principle
  • Identify special design constraint in on-shore facilities
  • Ability to perform post commissioning review & recommend improvements
  • Operation & Asset Integrity Management best practices

COURSE OUTLINE:

  1. Overview of codes & regulations
  2. Overview of Feasibility Study
  3. Site Survey & RoW (Right of Way) determination
  4. Mechanical and process design
  5. System Sizing and design
  6. Equipment selection criteria
  7. Overview of Safety in Design
  8. Construction stages and contract management
  9. Post production design review and optimization
  10. Operation & Asset Integrity/reliability Management

ABOUT THE COURSE LEADER:

Ir. Agus Ibrahim, Experienced with years of exemplary project management and contract in Oil & Gas infrastructure as well as mining/mineral infrastructure with an emphasis on scope, schedule, quality and HSE requirements to the best industry practice for engineering, fabrication and construction. Understandings critical requirements of both greenfield and brownfields project development from concept to execution. Passionate about manages and integrate of widely diverse technical and multi-cultural teams.

Excellent administration and management skills, including strategic planning, leadership, resource allocation, coordinating staff, exceptional critical thinking and analytical skills.

Well understand the project needs of both Contractor’s perspective and Company’s project life cycle perspective.

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization

Produk Terkait

Electrical Safety, Theory & Application

BACKGROUND: Electrical safety is vital in both workplace and home environments. While we use electricity daily, the risks are significantly higher in work settings, especially when high-voltage equipment is involved. Workers like engineers, electricians, technicians, and power line workers are directly exposed to electrical hazards. Office workers and salespeople, though less directly exposed, may still…

Rp 7.950.000
Tersedia

Contract Writing, Planning & Management

BACKGROUND: Whatever business deal occurs between two or more parties shall have proper and correct terms & conditions agreed by the parties. To ensure a smooth process and execution, and to minimize and mitigate potential risks, parties should bind the deal with a legal agreement. However, it quite common that the agreement not properly written…

Rp 7.950.000
Tersedia

Marginal Field Development

Technical Solutions & Study Cases from Various Fields in Indonesia BACKGROUND: Marginal fields refer to discoveries which have not been exploited for long, due to one or more of the following factors: Very small sizes of reserves/pool to the extent of not being economically viable Lack of infrastructure in the vicinity and profitable consumers Prohibitive…

Rp 10.950.000
Tersedia

Sistem Kontrol RHVAC

LATAR BELAKANG: Fungsi Refrigeration Heating Ventilating and Air Conditioning (RHAC) adalah untuk mengendalikan kondisi udara di dalam ruang yang ditentukan seperti suhu, kelembaban, kualitas udara, pasokan udara segar dari luar untuk mengendalikan kadar oksigen dan karbon dioksida, dan terakhir, mengendalikan pergerakan udara atau aliran udara. Selama bertahun-tahun, AC telah berubah dari sekadar mendinginkan ruangan menjadi…

Rp 6.950.000
Tersedia

Marginal Fields Development

Background: Marginal fields development refers to discoveries which have not been exploited for long, due to one or more of the following factors: • Very small sizes of reserves/pool to the extent of not being economically viable • Lack of infrastructure in the vicinity and profitable consumers • Prohibitive development costs, fiscal levies and or…

*Harga Hubungi CS
Tersedia

Technical Project Documentation Management

BACKGROUND: Every good project produces documentation that is well organized and easy to find. Return when information is needed to proceed to the next project phase or operation/maintenance process. It can be done manually although using software is much better. Nevertheless, it is very important that it shall exist & well managed   OBJECTIVES: This…

Rp 5.500.000
Tersedia
Index
Chat with us on WhatsApp
Chat with Us