- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Drilling & Completion Well Integrity
Rp 12.950.000| Stok | Tersedia |
| Kategori | Oil & Gas, Production Operation |
05 - 08 Mei 2026, Bandung
14 - 17 September 2026, Bandung
16 - 19 November 2026, Bandung
Trainer: Prof. Dr-Ing. Bonar Tua Halomoan Marbun
Drilling & Completion Well Integrity
BACKGROUND:
Well Integrity adalah penerapan teknis, operasional dan solusi secara terorganisasi untuk mengurangi resiko tidak terkendalinya siklus kehidupan suatu sumur migas dan menciptakan kondisi operasional yang optimum. Beberapa pengaruh dalam melakukan hal ini adalah kondisi sumur, kondisi lingkungan, dan kondisi peralatan yang dirancang dengan baik. Pemahaman secara advanced dari masalah Well Integrity, setidaknya harus mencakup 4 aspek yaitu: aspek teknis dan design, aspek operasional, aspek safety dan aspek biaya.
Pada saat pemboran diusahakan target pemboran tercapai baik lintasannya, waktu,biaya dan terhindarnya dari kerugian yang fatal akibat hambatan pemboran yang tidak dapat diantisipasi dengan baik seperti kick yang tidak tertangulangi sehingga terjadi blow out.
Pada aspek produksi evaluasi ini dilakukan dari kondisi konstruksi sumur, kondisi artificial liftnya dan kondisi reservoirnya dan kemampuan produksinya. Aspek aspek lain terhadap kegagalan operasi yang terjadi. Pemahaman ini dimulai dengan analisa terhadap konstruksi sumur, tekanan dan temperature kritis dan kondisi ambang yang menyebabkan kerusakan sumur serta cara antisipasi terhadap kegagalan suatu operasi produksi di sumur minyak.
OBJECTIVES:
Setelah mengikuti training ini diharapkan peserta dapat memahami dan mengerti tentang:
- Konsep dasar Well Integrity
- Well Conduction and field Development
- Well barrier
- Technical Well Bariers
- Aspek operasional dan kinerja pada well integrity, baik pada saat pemboran, saat well completion dan pada saat operasi produksi.
RECOMMENDED PARTICIPANTS:
Drilling Engineer, Drilling Superintendent, Drilling Supervisor, Rig Manager, Service Company Drilling, Workover Engineer, Production Engineer, Production Superintendent, Production Supervisor, Senior Operator, HSE Supervisor, dan Maintenance Supervisor
COURSE OUTLINE:
- Introduction of Well Integrity
- Well Integrity Management System and Risk Management:
-
- Well Integrity Management System
- Risk Assessment
- Well Construction evaluation and well development
- Well Barriers Analysis and Technical Well Barrier:
-
- Well Barriers Analysis
- Technical Well Barrier Concept
- Description of Typical barrier element
- Well Integrity Operation and Handling:
-
- Pressure Monitoring
- Drilling Operation
- Well Production Optimization
- Problem in Well and Handling:
Corrosion mitigation and prevention, Surface casing repairs, Temporary Well abandonment, Casing perforation, Review of primary
cementing and well integrity, Downtime and maintenance costs, Testing seals on wellheads
ABOUT THE COURSE LEADER:
Prof. Dr.-Ing. Bonar Tua Halomoan Marbun
Drilling & Completion Well Integrity
Asset Performance Management
BACKGROUND: When it comes down to the nuts and bolts of industry success, nothing quite matches the importance of Asset Performance Management: Maximizing Equipment Efficiency and Reliability. In a world where operational downtime is not an option, ensuring your assets are running at peak performance isn’t just beneficial; it’s critical. Diving deep into making our…
Rp 7.950.000
Power Plant Performance Test
BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…
Rp 7.950.000
Budgeting & Cost Control
BACKGROUND: Tujuan utama dari setiap korporasi adalah mendapatkan profit yang maksimal. Keuangan kita akan berada dalam kondisi yang buruk jika tidak berhati-hati dengan uang & tidak mengendalikan pengeluaran. Hal pertama yang harus dipahami adalah biaya dapat bertambah dengan cepat. Selanjutnya adalah jika pengeluaran ini tidak direncanakan atau jumlahnya sangat besar, hal itu akan berdampak pada…
Rp 7.950.000
Marginal Fields Development
Background: Marginal fields development refers to discoveries which have not been exploited for long, due to one or more of the following factors: • Very small sizes of reserves/pool to the extent of not being economically viable • Lack of infrastructure in the vicinity and profitable consumers • Prohibitive development costs, fiscal levies and or…
*Harga Hubungi CS
Construction Completion Management System
BACKGROUND: Managing the completion phase of construction projects is a critical step in ensuring that all systems and components are installed, tested, and handed over as per the design specifications and contractual obligations. The Construction Completion Management System (CCMS) serves as a structured approach to monitor, document, and manage the transition from construction to commissioning….
Rp 7.950.000
Pengambilan Contoh Uji Air (PCUA)
BACKGROUND: Training & Sertifikasi BNSP: Pengambilan Contoh Uji Air (PCUA) Pengambilan Contoh Uji Air (PCUA) adalah pekerjaan yang tidak mudah untuk dilakukan, hal ini disebabkan karena polutan dari air memiliki karakteristik yang sangat mudah berubah. Hal ini dapat dipengaruhi oleh situasi dan kondisi sekitarnya, seperti jumlah polutan yang terkandung, sifat kimia/biologi maupun fisika, dan intervensi…
Rp 8.950.000
>