• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
zoom preview activate zoom

Integrated Reservoir Management

Rp 10.950.000
Stok Tersedia
Kategori Oil & Gas

19 - 21 Januari 2026, Bandung

13 - 15 Juli 2026, Bandung

Prof. Dr.-Ing. Bonar Tua Halomoan Marbun

Tentukan pilihan yang tersedia!

Integrated Reservoir Management

Background:

Integrated Reservoir Management (IRM) is a structured approach to maximize the value of hydrocarbon assets by combining G&G, Reservoir Engineering, Drilling, Completion, Production, and Economic considerations into a single framework. Through effective integration of data and disciplines, operators can improve recovery factors, extend field life, and optimize development plans. This is where “Integrated” play crucial roles.

In practice, however, many engineers tend to focus narrowly on their own disciplines. For example, Production and Completion Engineers often prioritize well deliverability without paying sufficient attention to reservoir behavior, while geoscientists may overlook operational constraints. These siloed approaches lead to inefficiencies, missed opportunities, and suboptimal recovery. A proper IRM program helps overcome these bad habits by fostering collaboration, aligning objectives, and ensuring every decision accounts for both well performance and reservoir sustainability.

Objectives:

  • Understand the principles and importance of integrated reservoir management
  • Recognize the risks of siloed decision-making and the value of cross-disciplinary collaboration
  • Strengthening Production & Operations involvement in reservoir management
  • Apply multidisciplinary approaches to reservoir characterization and development
  • Evaluate production performance and identify opportunities for reservoir optimization
  • Develop reservoir surveillance programs and integrate monitoring data
  • Apply enhanced oil recovery (EOR) and improved oil recovery (IOR) strategies.
  • Build effective collaboration between geoscience, engineering, and operations teams.

Course Outline:

1. Introduction to Integrated Reservoir Management

  • Definition, scope, and objectives of IRM
  • Common bad habits: “my wells vs. your reservoir” mindset
  • Why integration matters for maximizing recovery

2. Reservoir Characterization

  • G&G data integration and Petrophysical evaluation
  • Reservoir modeling fundamentals

3. Reservoir Engineering Fundamentals

  • Material balance and decline curve analysis
  • Fluid flow in porous media
  • Drive mechanisms and recovery factors

4. Collaboration with Production & Operations Team in Reservoir Surveillance

  • Role of Production and Operations
  • Daily well monitoring and field reporting as surveillance inputs
  • Building cross-disciplinary awareness between reservoir and Operations

5. Production Data and Performance Evaluation

  • Well performance analysis & reservoir pressure data
  • Identifying production bottlenecks
  • Bridging production/well focus with reservoir sustainability

6. Reservoir Surveillance and Monitoring

  • Tools and techniques for surveillance
  • Production logging, pressure monitoring, tracer methods
  • Integrating real-time data for decision making

7. Reservoir Management Strategies

  • Primary, secondary, and tertiary recovery methods
  • Waterflooding and gas injection strategies
  • IOR/EOR project screening and evaluation

8. Field Development Planning

  • Reservoir simulation for forecasting and planning
  • Well placement and infill drilling strategies
  • Balancing short-term production goals with long-term recovery

9. Risk Management in Reservoir Development

  • Identifying and mitigating uncertainties
  • Sensitivity analysis and scenario planning
  • Cross-disciplinary decision-making

10. Case Studies and Best Practices in IRM

  • Lessons learned from siloed vs. integrated approaches
  • How poor coordination wastes reservoir potential
  • Group discussion and application exercise

About The Course Leader:

Prof. Dr.-Ing. Bonar Tua Halomoan Marbun

Integrated Reservoir Management

Produk Terkait

Gas Handling, Conditioning and Processing Facilities

BACKGROUND: Pengelolaan gas alam merupakan aspek kritis dalam operasi industri minyak dan gas, yang mencakup proses penanganan, pengkondisian, hingga pengolahan gas. Fasilitas gas membutuhkan pemahaman teknis mendalam untuk memastikan bahwa setiap tahapan dilakukan secara aman, efisien, dan sesuai dengan standar yang berlaku. Dengan semakin kompleksnya teknologi dan peralatan yang digunakan, serta meningkatnya tuntutan akan efisiensi…

Rp 7.950.000
Tersedia

Extended Reach Drilling (ERD)

BACKGROUND: Pelatihan Extended Reach Drilling (ERD) ini akan difokuskan untuk meningkatkan pemahaman peserta tentang desain dan aspek operasional dan design pada Extended Reach Drilling. Dengan tujuan khusus kegiatan operasi pemboran yang rumit dan menggunakan sudut inklinasi yang tinggi dan Panjang horizontal displacement yang sangat panjang menimbulkan problem tersendiri pada kegiatan operasi nya seperti pipa terjepit,…

Rp 14.950.000
Tersedia

Lifting Operation Oil & Gas

BACKGROUND: Lifting operation adalah usaha yang dilakukan oleh production engineer dan tim production engineer untuk mengangkat minyak dan gas dari dasar sumur ke permukaan, baik melalui sumur sumur alam (natural flow) mau pun sumur – sumur buatan (artificial lift). Biasanya artificial lift yang sering digunakan adalah Gas Lift well, Sucker Rod Pump well, Electric Submersible…

Rp 14.950.000
Tersedia

Oil & Gas Contract Management: Analysis of the Various Types of Production Sharing Agreement

BACKGROUND: Industri minyak dan gas bumi merupakan sektor strategis yang menghadirkan tantangan besar dalam pengelolaan kontrak. Production Sharing Contract (PSC) adalah salah satu bentuk kontrak yang sering digunakan dalam kerja sama antara pemerintah dan perusahaan minyak serta gas bumi (Oil & Gas Contract Management). PSC dirancang untuk memastikan pembagian keuntungan yang adil sekaligus mempromosikan investasi…

Rp 14.500.000
Tersedia

Comprehensive PSC Accounting

BACKGROUND: The oil and gas industry operates within a highly complex and dynamic regulatory environment, significantly shaped by changes in Production Sharing Contracts (PSC) and legislative reforms. The shift from the traditional Cost Recovery model to the Gross Split scheme has introduced new challenges and opportunities in accounting practices, fiscal management, and operational strategies. Due…

Rp 14.500.000
Tersedia

Formation Damage, Well Stimulation

Background: Formation Damage & Well Stimulation is just like a twin children. Formation damage is a common and often unavoidable issue that reduces well productivity and injectivity throughout drilling, completion, production, and workover operations. And Well Stimulation may need to come after. Improper fluid selection, solids invasion, fines migration, scaling, and organic deposition frequently result…

Rp 10.950.000
Tersedia
Chat with us on WhatsApp
Chat with Us