• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Beranda » Training » Maintenance » Power Plant Performance Test
zoom preview activate zoom

Power Plant Performance Test

Rp 7.950.000
Stok Tersedia
Kategori Maintenance, Manajemen, Power Generation, Production Operation, Training

1 - 3 July, 2025 - Bandung

Intructor: Dr. Willy Adriansyah, ST, MM

Tentukan pilihan yang tersedia!

Power Plant Performance Test

BACKGROUND:

The main reasons to conduct a power plant performance test are:

  1. Identify the baseline performance of the power plant in different operating cases
  2. Quantify the prior/after performance improvement due to a major maintenance outage.
  3. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good” actions are required.

A performance test is usually carried out after the construction or retrofit of a plant. It verifies that the plant can achieve its guaranteed parameters and function as intended. This 3-day training is designed to provide participants with the knowledge of power plant testing evaluation & efficiency improvements.

 

OBJECTIVES:

  1. Demonstrate working knowledge of terminology associated with Plant efficiency
  2. Describe the terms of Thermodynamic
  3. Define the terms of entropy, enthalpy, latent heat, sensible heat rate, etc.
  4. Thermodynamic process involves in each component of power plant
  5. Describe how changes in heat rate affect operating cost
  6. Describe the basic principle of boiler, steam turbine & heat exchanger
  7. Describe how boiler, turbine and heat exchanger affect heat rate
  8. Common areas of efficiency loss in power plant
  9. Describe the principle of plant efficiency testing using ASME Performance Test Code
  10. Data evaluation & plan for improvements

 

COURSE OUTLINE:

  1. ASME Performance Test Code
  2. Thermodynamic
  3. Steam Generators: theory, heat transfer, fuel consideration, auxiliary equipment, etc
  4. Steam Generator Combustion Theory & Equipment: theory & equations, fuel analysis, combustion equipment, efficiency testing & monitoring
  5. Steam Turbine: theory, type, construction detail, valves, efficiency
  6. Factors influencing Turbine Efficiency: steam condition, exhaust loss, size, configuration, mode of operation, mechanical condition, etc.
  7. ASME Performance Test Code for Turbine: practical aspects of turbine testing, thermal kits, generator corrections, calculation of change in heat rate, calculation of primary flow, diagnosis of turbine problems, example of simplified test calculation, example of testing program
  8. Power Plant Heat Exchanger: heat transfer theory, condenser testing
  9. Factors Affecting Heat Exchanger Performance: low circulating water flow rate, high air leakage, fouled tubes, high inlet water temperature, reduction in load, etc
  • Centrifugal Pump: theory, design & construction, testing & monitoring operation
  • Measuring Equipment: temperature, pressure, flow, electrical, flue gas, data logging & computer
  1. Evaluation: statistics, test design, data analysist & trending

ABOUT THE COURSE LEADER:

Dr. Willy Adriansyah, ST, MM graduated from Bandung Institute of Technology specializing on energy conservation. Post graduate program also obtained from ITB while the Doctoral is from Norway.

In addition to his duty as a lecturer, he has got abundant of real industrial experiences especially in power generation & oil/gas companies. Since 2013 he has completed many power generation performance tests; Cilegon, Lumut Balai, Ulu Belu, Dieng, Patuha and also other piping & coal handling optimization related to power generation.

Clients uses his services such as: PT. Indonesia Power, PT. Star Energi, PT. PLN, Total Indonesie, PT. Pama Persada, Chevron & Pertamina.

Power Plant Performance Test

Produk Terkait

BFPT Protection and Supervisory System

BFPT (Boiler Feed Pump Turbine) : Protection and Supervisory System Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan…

Rp 6.950.000
Tersedia

Maintenance Performance Indicator

BACKGROUND: Dalam proses Maintenance, indikator kinerja (KPI) adalah untuk mengukur kinerja tugas yang diberikan. Misal mengukur apa pun mulai dari waktu yang berlalu selama shutdown (terprogram atau tidak) hingga evolusi proses produksi. KPI bervariasi tergantung perusahaannya; tujuan, strategi, dan rencana tindakannya. Namun, ada satu set indikator yang dianggap lebih baik dan lebih sering digunakan. Indikator…

Rp 7.950.000
Tersedia

Uji Persiapan Operasi Pembangkit Listrik Tenaga Termal

BACKGROUND: Operasi pembangkit listrik yang lancar, bebas masalah, dan ekonomis selalu menjadi tujuan utama bagi semua pihak yang bergerak di sektor pembangkitan listrik. Untuk mencapai tujuan tersebut, salah satu kegiatan yang sangat penting adalah memastikan bahwa peralatan utama dan peralatan bantu pembangkit telah dipersiapkan dengan cermat sebelum dimasukkan ke dalam sistem. Proses ini dikenal sebagai…

Rp 7.950.000
Tersedia

Manajemen Risiko Sesuai ISO 31000

BACKGROUND: Proses pengelolaan resiko menurut ISO 31000 seharusnya merupakan bagian yang terintegrasi, melekat dalam budaya dan praktik manajemen, dan tercustomisasi menurut proses bisnis organisasi. Menurut ISO 31000, asesmen risiko merupakan bagian yang paling penting dan fundamental dalam proses pengelolaan risiko. Oleh karena itu, organisasi perlu melakukan asesmen risiko yang benar agar memperoleh laporan profil risiko…

Rp 7.950.000
Tersedia

Construction Completion Management System

BACKGROUND: Managing the completion phase of construction projects is a critical step in ensuring that all systems and components are installed, tested, and handed over as per the design specifications and contractual obligations. The Construction Completion Management System (CCMS) serves as a structured approach to monitor, document, and manage the transition from construction to commissioning….

Rp 7.950.000
Tersedia

Mechanics of Engineering Materials

BACKGROUND: Engineering materials are the foundation of all mechanical and structural designs. Understanding the behavior and properties of materials under different loading conditions is critical for designing safe, efficient, and durable structures and components. The study of the mechanics of engineering materials provides engineers with the tools to predict material performance, analyze failures, and select…

Rp 7.950.000
Tersedia