• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
zoom preview activate zoom

Plant Turn Around & Strategic Management

Rp 8.950.000
Stok Tersedia
Kategori Maintenance, Mechanical

Instruktur: Ir. Syafuan Gani, MM

Bandung, 9-12 Juni, 2025

Tentukan pilihan yang tersedia!

Plant Turn Around & Strategic Management

Background

Management Outage plays a crucial role in achieving safe, efficient, and cost-effective operational performance. Outage management involves policies, coordination, safety measures, regulatory compliance, technical requirements, and hazardous activities before and after an outage.

This training focuses on equipping participants with a comprehensive understanding of the synergistic and continuous processes involved in Planned Outage (PO) maintenance. It covers planning, preparation, execution, control, monitoring, evaluation, and follow-up action plans to ensure seamless and effective maintenance activities.


Objectives

By the end of this training, participants will be able to:

  • Understand the scope of Planned Outage (PO) maintenance programs.
  • Develop schedules for Overhaul (OH) activities.
  • Establish procedures to successfully complete OH tasks.
  • Prepare equipment and materials required for OH.
  • Monitor, control, evaluate, and report the outcomes of OH implementation.

Recommended Participants

This training is ideal for:

  • Operations personnel
  • Engineers
  • Maintenance teams
  • Planners responsible for maintenance planning, cost control, outage management, and asset management.

Course Outline

  1. Introduction to Outage Management
    • Definition and importance of outage management in operational efficiency.
  2. Scope of Planned Outage (PO) Maintenance Programs
    • Determining the scope of work.
    • Scheduling of maintenance activities.
    • Creating work packages, including resource needs (personnel, materials, tools) and facilities.
    • Establishing quality standards and performance targets.
  3. Budgeting and Cost Management
    • Setting budgets and cost allocations for outage activities.
  4. Communication Methods and Standard Operating Procedures
    • Developing standardized procedures for effective communication.
  5. Overhaul (OH) Execution
    • Step-by-step guidance on performing overhaul tasks safely and efficiently.
  6. Reporting and Documentation of OH Results
    • Preparing and submitting detailed reports post-outage.
  7. Measuring Outage Management Effectiveness
    • Key Performance Indicators (KPIs).
    • Assessing maturity levels of outage management practices.

Plant Turn Around & Strategic Management

Produk Terkait

API 580 Risk Based Inspection

API 580 – Risk Based Inspection and Maintenance, Repair Background Dalam industri proses berisiko tinggi, kegagalan peralatan seperti pressure vessel, piping, heat exchanger, dan storage tank dapat menimbulkan dampak serius terhadap keselamatan, lingkungan, dan kontinuitas operasi. Pendekatan inspeksi konvensional berbasis waktu (time-based inspection) sering kali tidak efektif dan kurang optimal dari sisi biaya dan risiko….

Rp 7.950.000
Tersedia

BOILER (Pengoperasian Burner System: Coal, Main Oil Gun, Tiny Oil Gun)

BACKGROUND: Pada Pembangkit berbahan bakar batubara, proses start awal boiler tidak bisa langsung menggunakan batubara karena temperatur di furnace masih rendah. Untuk menaikkan temperatur furnace maka digunakan bahan bakar HSD (High Speed Diesel) melalui alat main oil gun. Pada main oil gun terdapat dua saluran utama yaitu saluran bahan bakar HSD dan saluran atomizing air….

Rp 7.950.000
Tersedia

Gas Hazard & Measurement

BACKGROUND: Gas Hazard & Measurement is a training program designed to address gas as a highly flammable material, requiring special control and handling. A solid understanding of anticipating and measuring potential gas hazards is essential before utilizing it for various purposes. . Numerous fires, explosions, and poisoning incidents occur due to negligence in recognizing gas…

Rp 7.950.000
Tersedia

Safety Integrity Level (SIL)

BACKGROUND: Dalam keselamatan fungsional, Safety Integrity Level (SIL) (dalam Bahasa Indonesia disebut sebagai tingkat integritas keselamatan) didefinisikan sebagai tingkat relatif pengurangan risiko yang disediakan oleh fungsi instrumen keselamatan (SIF, Safety Instrumented System), yaitu pengukuran kinerja yang dibutuhkan SIF. Dalam standar keselamatan fungsional berdasarkan standar IEC 61508, empat SIL didefinisikan, dengan SIL4 sebagai yang paling dapat…

Rp 7.950.000
Tersedia

Flow Accelerated Corrosion

BACKGROUND: Flow Accelerated Corrosion (FAC) is a critical issue in industrial systems where high-velocity fluids interact with metallic surfaces, leading to accelerated material degradation. Commonly found in power plants, oil and gas operations, and chemical processing facilities, FAC poses significant risks to system integrity, safety, and operational efficiency. Left unaddressed, FAC can result in costly…

Rp 7.950.000
Tersedia

Operasi dan Perawatan PLTU

Background Manajemen operasi dan pembangkitan merupakan upaya memahami serta mengelola proses operasi sistem pembangkit tenaga listrik dan sistem penyaluran secara rasional, ekonomis, dan berkelanjutan, dengan tetap memperhatikan mutu, efisiensi, dan keandalan operasi. Pada Pembangkit Listrik Tenaga Uap (PLTU), keberhasilan operasi sangat dipengaruhi oleh efektivitas perawatan. Perawatan pembangkitan yang terencana dan dilaksanakan secara efektif akan meningkatkan…

Rp 7.950.000
Tersedia
Chat with us on WhatsApp
Chat with Us