17 – 19 Desember, 2025 di Hotel Melia Purosani, Yogyakarta

Instructor: Prof. Herianto, Ir, M.Sc., Ph.D 

Tentukan pilihan yang tersedia!

Practical Drilling

BACKGROUND:

This course teaches how to listen to the well, perform simple tests on the rig, and make proper decisions unique to each well. The intent is to eliminate visible and invisible Non-Productive Time (NPT). Visible NPT includes stuck pipe, conditioning drilling fluid, lost circulation, etc. Invisible NPT is often far more expensive and includes drilling much slower than is possible, wearing out the bits prematurely, and bad cement barriers. Considerable attention is devoted to correcting drilling fluid properties and controlling filter cake quality. This eliminates many seen and unseen obstacles for drilling a trouble-free hole as cheaply as possible. This involves proper drilling fluid processing in the surface tanks. No discussion will be presented of fishing tools—they should rarely be needed after this course. Bring a calculator—you will need it.

 

OBJECTIVES:

Participants will learn how to:

  • Calibrate a mud logger’s gas unit curve
  • Interpret gas unit curves
  • Determine pore pressure
  • Select the correct nozzle sizes and flow rate to make the fluid strike the bottom of the hole with the greatest force possible or the greatest power available
  • Select drilling fluid yield point needed to clean the vertical portion of the well
  • Extend the life of drill bits and have the maximum drilling rate by determining the flounder point of a roller cone or PDC bit
  • Avoid poor cementing jobs by creating a thin, slick, compressible filter cake
  • Decrease vibration which seriously impacts PDC bit performance by eliminating drilled solids
  • Arrange equipment for a proper PIT
  • Read Pressure Integrity charts
  • Evaluate dull bits to select the best next bit
  • Understand well bore instability

 

COURSE OUTLINE:

  1. Interpretation of mud logger gas units
  2. Determining pore pressure
  3. On-site hydraulic optimization
  4. Selecting proper bit loading (weight on bit and rotary speed) for the fastest, cheapest hole
  5. Interpreting pressure integrity tests
  6. Hole problems (such as, stuck pipe, lost circulation, and ballooning)
  7. Borehole stability
  8. Operating guidelines
  9. Drilling fluid properties necessary to maximize drilling performance
  10. Discussion of polymers in drilling fluids
  11. Solids control equipment arrangement to assure best drilled solids removal

ABOUT THE COURSE LEADER:

Prof. Herianto, Ir, M.Sc., Ph.D is Doctor of Philosophy in Petroleum Engineering, UTM, SKUDAI, Malaysia. Magister Engineer in Petroleum Engineering, with specialty in Drilling Engineering at ITB. Team Leader Project Technical Proposal and Financial Evaluation WKP Geothermal Prospect Tangkuban Perahu, Cisolok Sukarame and Tampomas, Instructor Public and In-house Training for Drilling, Completion and Production programs Pipeline, Refinery, Oil and Gas Economic Evaluation. PT. Chevron Pasific Indonesia, CNOOC SES, Petrochina Int Bermuda, PT. PERTAMINA EP, Medco Energy, BP, Kondur Petroleum SE, Sclumberger, BP MIGAS. Engineering Consultant PT. Juang Jaya, PT. Arto Moro, PT. Indolas, PT. Promosindo Media Tenaga for Project Oil and Gas Exploration and Geothermal. Coordinator and Team Research Project Pertamina Geothermal. Head Formation Evaluation laboratory, Petroleum Eng. Dept. UPN, Yogyakarta. Lecture at UPN: Drilling, Offshore Drilling, Geothermal Drilling Production Operation.

Practical Drilling

Produk Terkait

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization

BACKGROUND: Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process. Ideally this includes post start-up review optimization and asset integrity management to…

Rp 7.950.000
Tersedia

Reservoir Simulation

BACKGROUND Production and operation teams cannot directly observe how conditions change within a reservoir during production. Instead, they depend on sophisticated simulation models that transform subsurface. Therefore, reservoir simulation serves as a cornerstone for understanding reservoir performance and optimizing recovery strategies. Integrating geoscience, production data, engineers can forecast future performance under various scenarios, identify operational…

Rp 9.950.000
Tersedia

Pengambilan Contoh Uji Air (PCUA)

BACKGROUND: Training & Sertifikasi BNSP: Pengambilan Contoh Uji Air (PCUA) Pengambilan Contoh Uji Air (PCUA) adalah pekerjaan yang tidak mudah untuk dilakukan, hal ini disebabkan karena polutan dari air memiliki karakteristik yang sangat mudah berubah. Hal ini dapat dipengaruhi oleh situasi dan kondisi sekitarnya, seperti jumlah polutan yang terkandung, sifat kimia/biologi maupun fisika, dan intervensi…

Rp 8.950.000
Tersedia

BOILER (Pulverizer & Soot blower System)

BACKGROUND: Pada Pembangkit Listrik Tenaga Uap (PLTU) berbahan bakar Batu Bara, Soot Blower dan Pulverizer merupakan alat-alat yang sangat penting. Soot blower berfungsi untuk membersihkan tube pada boiler pada Heat Recovery Area (HRA) yaitu area Superheater, Economizer, Reheat, serta pada Air Heater dari kotoran/slag yang menempel. Sedangkan Pulverizer merupakan penyedia serbuk bahan bakar batu bara…

Rp 7.950.000
Tersedia

Flow Accelerated Corrosion

BACKGROUND: Flow Accelerated Corrosion (FAC) is a critical issue in industrial systems where high-velocity fluids interact with metallic surfaces, leading to accelerated material degradation. Commonly found in power plants, oil and gas operations, and chemical processing facilities, FAC poses significant risks to system integrity, safety, and operational efficiency. Left unaddressed, FAC can result in costly…

Rp 7.950.000
Tersedia

Maintenance & Reliability for Oil and Gas Upstream Operation

BACKGROUND: In Indonesia especially in the upstream oil and gas business as well as the manufacturing business and other heavy industries. There are similar problems where the age of the plant and the main equipment which statistically have the majority aging condition for more than 30 years. Problems of aging absolences and low qualifications of…

Rp 7.950.000
Tersedia