- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
POD, WP&B, and AFE
Rp 14.750.000| Stok | Tersedia |
| Kategori | Oil & Gas |
Instructor: Benny Lubiantara / Dr. A. Rinto Pudyantoro, MM, Ak, CA
Bandung: 25 – 26 Juni, 2026
Bandung: 20 – 21 Oktober, 2026
POD, WP&B, and AFE
BACKGROUND:
Kegiatan utama dan pertama bisnis hulu migas adalah mencari dan membuktikan keberadaan migas. Apabila cadangan berhasil ditemukan, maka selanjutnya keputusan investasi dan pengembangan akan ditentukan dengan mempertimbangkan hasil perhitungan keekonomian lapangan. Selanjutnya POD, WP&B, and AFE akan dibuat untuk pengembangan lapangan.
Pada tahapan tersebut, PSC Planning sudah dimulai dan dibutuhkan. training akan diawali dengan diskusi tentang keekonomian proyek dalam kerangka pelaksanaan PSC Cost Recovery dan juga PSC Gross Split. Kemudian dilanjutkan dengan diskusi terkait POD (Plan of Development), yang membahas konseptual, ketentuan, prosedur dan penyiapan dokumentasinya. Setelah sesuai degan proses perencanaan, diskusi dilanjutkan dengan menyiapkan WP&B dan AFE untuk pekerjaan tahunan. Diksusi terkait dengan WP&B dan AFE tidak sebatas terkait prosedur, namun dibahas pula konsep dan prinsip dasar dibalik ketentuan dan proses penyiapannya
OBJECTIVES:
Setelah mengikuti pelatihan ini peserta dapat mengetahui dengan benar dan melengkapi dirinya dengan pengetahuan tersebut, sehingga akan bermnnanfaat disaat mengerjaan pekerjaan keseharian.
RECOMMENDED PARTICIPANTS:
Karyawan di sektor Oil & Gas mencakup pekerja teknis di lapangan, tim eksplorasi, drilling, produksi, dan pemeliharaan. Selain itu, termasuk pula supply chain, perencanaan, komersialitas, proyek pengembangan, serta tim keuangan, SDM, humas, legal, admin, dan operasional lainnya.
COURSE OUTLINE:
- Upstream business National & Global issues.
- The operation of PSC Cost Recovery & PSC Gross Split in Business Planning perspective
- Cost and Cost recovery treatment: miss understanding of cost recovery principles
- Cost and taxation under PSC gross Split
- Development: reserves, resources and production forecasts; Estimating project revenues over time Estimating costs and cash outlays over time; Looking at net cash flows; External Factors Affecting Project Analysis.
- Discussion on decision Criteria and Cash Flow Analysis: Introduction to Net Present Value (NPV) Internal Rate of Return (IRR); Payback; Profitability; Discount rates; Break-even analysis; Risk and Uncertainty In Decision Making; Identifying project risks in -Revenues-Production flows-Oil prices-Costs-Interest rates.
- Corporate views of risk: Marketing, negotiations and concessions: Presentation of project analysis results: Implementation in Indonesia; Laws and Contractual Aspects
- POD: POD Preparation, 1st POD, POP, POFD, Relinquishment procedures and tax impact; Monitoring POD, Unitization principles.
- WP&B & AFE: Budget schedules; Budgeting process and mechanism; Exploration and development cost; Capital & Non-Capital expenditures; Routine and Non Routine expenditures; Cost Oil and cost gas; AFE: what and why?
- WP&B and AFE based on PSC Cost Recovery and PSC Gross Split
ABOUT THE COURSE LEADER:
Benny Lubiantara/ DR. A Rinto Pudyantoro, MM, Ak, CA
POD, WP&B, and AFE
Flow Assurance for Pipeline System
BACKGROUND: This course will provide an understanding of flow phenomena that can help the participants avoid problems such as hydrate formation, pressure (surge) waves, or high viscosity liquid flow failure. This intensive, four-day intermediate level course addresses several critical problems in achieving pipeline flow assurance. The focus of this course is on potential challenges to…
Rp 7.950.000
Petroleum Resources Management System
Background: The Petroleum Resources Management System (PRMS) is an internationally recognized framework used to classify, evaluate, and report petroleum resources and reserves in a consistent and transparent manner. PRMS goes beyond volumetric estimation by integrating technical maturity, commercial viability, risk, and uncertainty into a project-based decision framework. For professionals outside the subsurface discipline, PRMS provides…
*Harga Hubungi CS
Sand Control Management
BACKGROUND: In oil & gas production, sand production remains a critical issue can significantly impact equipment integrity, production efficiency, & overall operational safety. If not properly managed, produced sand can lead to severe erosion of equipment, flow restrictions, & even complete system failures. Hence, effective sand control management is essential to ensuring long-term well productivity…
Rp 10.950.000
Extended Reach Drilling (ERD)
BACKGROUND: Pelatihan Extended Reach Drilling (ERD) ini akan difokuskan untuk meningkatkan pemahaman peserta tentang desain dan aspek operasional dan design pada Extended Reach Drilling. Dengan tujuan khusus kegiatan operasi pemboran yang rumit dan menggunakan sudut inklinasi yang tinggi dan Panjang horizontal displacement yang sangat panjang menimbulkan problem tersendiri pada kegiatan operasi nya seperti pipa terjepit,…
Rp 14.950.000
Reserves and Resources Evaluation
BACKGROUND: Understanding and calculating oil & gas reserves is a vital part of reserves and resources evaluation. Moreover, it is essential for asset management, investment decisions, and ensuring regulatory compliance. Therefore, this training provides a clear overview of reserves and resources definitions using SPE PRMS guidelines. In addition, it covers U.S. SEC regulations and Indonesian…
Rp 10.950.000
Practical Drilling
BACKGROUND: This course teaches how to listen to the well, perform simple tests on the rig, and make proper decisions unique to each well. The intent is to eliminate visible and invisible Non-Productive Time (NPT). Visible NPT includes stuck pipe, conditioning drilling fluid, lost circulation, etc. Invisible NPT is often far more expensive and includes…
Rp 13.950.000
>