- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Integrated Production Optimization of Oil & Gas
Rp 10.950.000| Stok | Tersedia |
| Kategori | Engineering, Oil & Gas, Production Operation |
Trainer: Prof. Dr.-Ing. Bonar Tua Halomoan Marbun
Bandung, 17 - 19 February, 2026
Bandung, 8 - 10 June, 2026
Bandung, 2 - 4 November, 2026
Integrated Production Optimization of Oil & Gas
BACKGROUND:
Dalam industri minyak dan gas, tantangan operasional yang kompleks seperti fluktuasi produksi, penurunan cadangan, dan peningkatan biaya operasional membutuhkan pendekatan terpadu untuk mengoptimalkan proses produksi. Pelatihan ini dirancang untuk memberikan pemahaman mendalam tentang konsep dan teknik integrasi dari reservoir, sumur, fasilitas permukaan, hingga jaringan distribusi. Dengan pendekatan ini, peserta dapat mengidentifikasi peluang peningkatan efisiensi, mengurangi downtime, serta meningkatkan produksi secara berkelanjutan.
Melalui pelatihan ini, peserta akan mempelajari penggunaan teknologi terbaru, analisis data real-time, dan strategi kolaborasi lintas disiplin untuk mencapai hasil yang maksimal. Pemahaman dan implementasi konsep optimasi produksi yang terintegrasi menjadi kunci keberhasilan dalam memastikan keberlanjutan operasi minyak dan gas di era persaingan global yang semakin ketat.
OBJECTIVES:
Setelah mengikuti training ini diharapkan peserta dapat memami, beberapa aspek produksi mnyak dan gas, sebgai berikut :
- Mengerti dan memahami tentang aspek reservoir migas
- Mengerti dan memahami aspek produksi migas di lapangan
- Mengerti dan memahami proses car acara optimisasi produksi minyak dan gas di lapangan
- Mengerti dan memahami aspek integritas reservoir, penilaian formasi dan aspek produksi di sumur dan surface facility.
RECOMMENDED PARTICIPANTS:
Peserta dari training ini adalah:
- Petroleum Engineer
- Reservoir Engineer
- Technical data support
- Production Engineer
- Production Supervisor
- Production Operator
- Well Service Supervisor
COURSE OUTLINE:
- Reservoir Minyak dan Gas Bumi :
-
- Pemahaman tentang reservoir minyak dan gas seperti batuan reservoir
- Trap dan jenis reservoir
- Perhitungan Cadangan dan Decline Curve:
-
- Exponential Decline
- Harmonic Decline
- Hyperbolic Decline
- Sifat Fisik: Fluida, Gas, Air;
-
- Density
- API Gravity
- Viscosity
- Compressibility
- Penilaian Formasi:
-
- Coring,
- Logging
- Well test
- Dasar Teknik Produksi
- Tubing Design
- Nodal Analysis
- Subsurface Equipment
- Wellhead & Christmas Tree
- Desain Artificial Lift
- Oil, Gas Handling Facilities
ABOUT THE COURSE LEADER:
Prof. Dr.-Ing. Bonar Tua Halomoan Marbun is a seasoned academic and industry expert with over 25 years of experience in petroleum and geothermal engineering. Currently serving as a Permanent Professor in Drilling Engineering at Institut Teknologi Bandung (ITB), he has held key academic leadership roles including Head of both Undergraduate and Postgraduate Petroleum Engineering Programs. His academic credentials include a Diplom-Ingenieur and Doctorate from Clausthal University of Technology, Germany, with research focused on drilling materials and unconventional cement systems.
Prof. Bonar has actively contributed to national and international energy sectors through consultancy, training, and policy advising. He has served as an Independent Safety Control Team member for Indonesia’s Ministry of Energy and Mineral Resources, and as a reviewer and expert for the U.S. Department of Energy. He is also an experienced instructor for Schlumberger NexT and a frequent speaker at industry training programs across Asia and Europe. His teaching and consulting portfolio spans companies such as Pertamina, Chevron, and SKK Migas, with specializations in drilling engineering, production optimization, and oil & gas regulations.
Integrated Production Optimization of Oil & Gas
Database Analysis & Dashboard Reporting
Powerful Database Analysis & Dashboard Reporting using Microsoft Excel BACKGROUND: The process of analyzing data and creating a dashboard summary report from text files imported from large applications, such as SAP/ERP, is still often conducted using time-consuming methods, taking hours or even days, even when using Microsoft Excel. However, by employing advanced methods—already available in…
Rp 6.950.000
Substitution Equipment & Control Relay
BACKGROUND: In modern power generation and industrial systems, ensuring the reliability and continuity of operations is paramount. Substitution Equipment & Control Relay play a critical role in maintaining system integrity, providing backup solutions, and automating essential processes. As equipment ages or technology evolves, it becomes necessary to replace or upgrade these components to avoid system…
Rp 7.950.000
Pengoperasian BFPT, Protection & Supervisory System
BACKGROUND: Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan oleh boiler. BFPT dapat berbentuk pompa sentrifugal atau jenis…
Rp 7.950.000
Project Control and Scheduling Using MS Project
BACKGROUND: Aktivitas proyek dapat terjadi di segala bidang di perusahaan, baik proyek fisik (infrastruktur) seperti proyek pembelian peralatan, pemasangan fasilitas, pendirian pabrik baru maupun non fisik seperti proyek pengembangan produk baru,perancangan struktur organisasi, pembuatan sistem informasi manajemen dan peningkatan produktivitas perusahaan. Realitas di lapangan menunjukkan bahwa sering terjadi kegagalan dalam menjalankan proyek disebabkan oleh adanya…
Rp 7.950.000
Mekanika Fluida & Pemeliharaan Pompa Kompresor
BACKGROUND: Pompa dan kompresor adalah peralatan vital dalam berbagai industri, termasuk minyak dan gas, manufaktur, pembangkit listrik, serta pengolahan air. Kinerja yang optimal dari kedua alat ini sangat bergantung pada pemahaman yang mendalam tentang mekanika fluida serta penerapan teknik pemeliharaan yang tepat. Tanpa pengelolaan yang baik, pompa dan kompresor rentan terhadap kerusakan, efisiensi yang rendah,…
Rp 7.950.000
Economics & Commercial Aspects of POD
Background: Plan of Development (POD) of oil & gas fields represents a very complex problem and involves huge amounts of investments. POD is also one of the main business processes in Indonesia PSC besides Work Program & Budget (WP&B) and Authorization for Expenditure (AFE). Understand POD mechanism is very importance for anyone working on oil…
Rp 14.950.000
>



