- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Boiler Control & Burner Management System
Rp 7.950.000| Stok | Tersedia |
| Kategori | 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi, Instrumentation and Control, Maintenance |
04 - 06 Mei 2026, Bandung
01 - 03 September 2026, Bandung
02 - 04 Desember 2026, Bandung
Trainer: Ir. In Jumanda K, MT
Boiler Control & Burner Management System
OBJECTIVES:
Participant will be able to:
- Understand the benefit of improved boiler process control and saving as result of improved efficiency
- Develop proper control system documentation
- Apply principles and methods for flow level measurements to improved boiler operations
- Specify appropriate strategies for flow, level and pressure control
- Tuning of boiler control system
- Implement analyzer measurements for improving boiler efficiency
- Analyze basic control loops required for boiler operation
- Apply control concept such as cascade, ratio and feedforward control for boiler control
- Specify appropriate safety system interlocks
- Evaluate process requirement for writing instrumentation specifications
- Understand the primary cause of furnace explosions
- Use design basis documentation and flow sheet
- Identify equipment needs for gas, oil, and pulverized coal system
- Understand pre-firing purge requirements procedures for single and multiple burner systems
- Implement flame failure protection for specific system
- Design alarms, interlock, and emergency shutdown system
- Understand the function and use the burner front, operator interface, and logic system
TRAINING OUTLINE:
- Basic control loop
- Combustion of fuels
- Fuel gas analysis
- Steam supply and firing rate demand
- Feedwater control system
- Boiler draft system
- Combustion control
- Improving operation with computers and analyzers
- Emerging technologies
- Causes of furnace explosions
- BMS interlock and alarm system
- Control systems
- System design trip philosophy
- Programable electronic systems
- Develop P&IDs for the boiler and gas, oil, and pulverized coal
- Review methods of efficiency calculations
- Use personal computer software to simulate boiler start-up and shutdown, and boiler control including drum level and cross-limiting fuel control
- Tune a boiler control system for maximum efficiency and learn the effect to boiler tuning
WHO SHOULD ATTEND?
Instrument & control engineering, Operation engineering, Process & utility supervisor, Technical Management, Quality control & technical supervisory personnel involved in boiler control & burner management system engineering.
Anda mungkin perlu:
Boiler Control & Burner Management System
0%
P&ID dan Logic Diagram Pembangkit
BACKGROUND: Logic diagram menyajikan detail yang secara skematis memperlihatkan semua instrument peralatan yang akan mempengaruhi berlangsungnya pengaturan yang bersifat sekuensial yaitu peralatan-peralatan yang berpengaruh dalam berlangsungnya pengaturan seperti Switch, Timer, dan memor yang mempunyai keluaran sebagai pengenali/menjalankan Pompa, Katup, Compresor dan sebagainya. Schematic diagram dibuat untuk memperlihatkan semua peralatan listrik yang digunakan meliputi shematic control…
Rp 7.950.000 Rp 7.950.000
Proactive Maintenance
BACKGROUND: Proactive maintenance is a maintenance strategy that aims to identify and fix the reasons for equipment failure before it happens. The goal of proactive maintenance is to increase asset reliability and reduce the risk of downtime. Wear and tear is a normal part of equipment life cycles. However, a solid proactive maintenance strategy can…
Rp 7.950.000
Reliability Instrument and Control
BACKGROUND: Kehandalan (reliability) sebuah plant menjadi kritikal untuk kesuksesan sebuah perusahaan. Kehandalan sebuah plant dibangaun dari kehandalan masing – masing peralatan yang berfungsi secara bersama. Plant yang handal akan mengasilkan availability waktu produksi yang tinggi. Peralatan instrumentasi dan control memeiliki peran penting sebagai fungsi proteksi dan juga control dan monitoring proses produksi. Kegagalan peralatan instrumentasi…
Rp 7.950.000
Oil & Gas Surface Facilities and Measuring System
PENDAHULUAN: Industri minyak dan gas mencakup aktifitas yang sangat luas, sejak tahap eksplorasi sampai dengan eksploitasi serta melibatkan disiplin ilmu yang sangat kompleks. Yang kasat mata adalah kegiatan di atas permukaan (oil & gas surface facilities and measuring system). Karena sifat minyak/gas yang mudah terbakar, maka diperlukan tenaga berkompeten untuk menanganinya. Satu disiplin ilmu saja…
Rp 14.950.000
Project Management & Scheduling using Primavera
BACKGROUND: Manajemen proyek dan penjadwalan yang efektif adalah kunci keberhasilan dalam menyelesaikan proyek tepat waktu, sesuai anggaran, dan dengan hasil yang memuaskan. Proyek yang kompleks memerlukan pendekatan yang sistematis untuk merencanakan, mengatur sumber daya, serta memantau kemajuan secara real-time. Primavera merupakan perangkat lunak yang dirancang untuk membantu para profesional mengelola semua aspek proyek secara efisien…
Rp 6.950.000
E-Procurement Berbasis ICT
LATAR BELAKANG: e-Procurement adalah proses pengadaan barang/jasa pemerintah yang pelaksanaannya dilakukan secara elektronik yang berbasis web/ internet dengan memanfaatkan fasilitas teknologi komunikasi dan in-formasi yang meliputi pelelangan umum, pra-kualifikasi dan sourcing secara elektronik dengan menggunakan modul berbasis website. Proses Pengadaan barang dan jasa yang dilakukan dengan menggunakan e-procurement secara signifikan akan meningkatkan kinerja, efektifitas, efisiensi, …
Rp 5.750.000
>