- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Integrated Production Optimization
Rp 8.950.000| Stok | Tersedia |
| Kategori | 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi, Oil & Gas |
Trainer: Prof. Dr.-Ing. Bonar Tua Halomoan Marbun
Integrated Production Optimization
Background & Objectives:
A production system is the system that transports reservoir fluid from the subsurface to the surface and separates it into oil, gas, and water. From there the oil and gas streams are treated if necessary and prepared for sale or transport from the field. Any water produced will also treated and prepared for disposal or reinjection into the reservoir. The basic elements of a production system are the reservoir, perforations, production packer, production casing, tubing, wellhead, choke, flowline, separator, and tank. Therefore, an integrated production optimization should always be the way the leader have in mind to implement.
This course will provide participants with the knowledge of integrated subsurface surface production optimization. During this course, participants will also learn about nodal analysis and the identification of major pressure losses from the reservoir to separator. The use of specialized software to identify constraints and to propose recommendations to optimize the field will also be covered.
Recommended Participants
Petroleum Engineer, Reservoir Engineer, Technical data support, Production Engineer, Production Supervisor, Production Operator, Maintenance dan support operation
Course Outline
Session 1:
1. Integrated Production Systems and Production Processes
2. Production system loops
3. Well completion and production methods
4. Production well test
5. Gathering and processing facilities
Session 2:
1. Nodal Analysis
2. Main components of pressure drop
3. Inflow Performance Relationship (IPR): reservoir, completion
4. Subsurface to surface system
5. Flow rates in pipes and restrictions
Session 3:
1. Subsurface Surface Production Operation
2. Identification of restrictions and correctives actions
3. Performance management
4. Advanced optimization applications
5. Integrated subsurface surface automation concept
Session 4:
1. Integrated Application System and Production System Modeling
2. Integrated application systems
3. Software used in Industry
4. Production system modeling
5. Examples using PIPESIM
Session 5:
1. Technological Trends and Integrated Information Systems
2. Well instrumentation technology
3. Oil and gas production applications
4. Smart wells and fields
About The Course Leader:
Prof. Dr.-Ing. Bonar Tua Halomoan Marbun
Integrated Production Optimization
Rig and Equipment Selection
Background: Rig and equipment selection is a critical early decision in drilling planning that directly affects safety, operational efficiency, cost, and overall project success. Inappropriate rig selection can lead to operational limitations, excessive non-productive time (NPT), or increased HSE exposure. For example, lack of appropriate knowledge may wrongly select rig rental company during tender evaluation….
Rp 5.950.000
Process Safety Management
BACKGROUND Process Safety Management (PSM) atau Manajemen Keselamatan Proses (MKP) dilaksanakan oleh perusahaan-perusahaan atau industri kimia/ petro-chemical, minyak & gas bumi (migas) setelah beberapa kejadian fatal yang telah banyak menelan korban jiwa dan harta benda seperti kasus Flixborough (Juni 1974), Seveso (Juli 1976), Bhopal (Desember 1984), Piper Alpha (Juli 1988), dan lain sebagainya . Dalam…
Rp 7.950.000
PTK 007 Revisi 05
BACKGROUND: PTK 007 Revisi 05 adalah versi terkini sebagai Pedoman Pelaksanaan Pengadaan Barang dan Jasa Di Industri Hulu Minyak dan Gas Bumi Indonesia. Cost Recovery manjadi salah satu target yang harus dipenuhi dalam bisnis migas di Indonesia. Salah satu syarat agar biaya yang dikeluarkan dapat disetujui sebagai biaya operasi yang dapat cost recovery adalah dengan…
Rp 14.950.000
Power Plant Performance Test
BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…
Rp 7.950.000
Boiler Control & Burner Management System
OBJECTIVES: Participant will be able to: Understand the benefit of improved boiler process control and saving as result of improved efficiency Develop proper control system documentation Apply principles and methods for flow level measurements to improved boiler operations Specify appropriate strategies for flow, level and pressure control Tuning of boiler control system Implement analyzer measurements…
Rp 7.950.000
Digital Engineering: Transformasi dari CAD ke BIM
Artikel ini membahas evolusi Digital Engineering, dari metode desain tradisional berbasis CAD ke implementasi Building Information Modeling (BIM) yang canggih. Pelajari bagaimana transformasi ini meningkatkan efisiensi dan kolaborasi dalam proyek-proyek modern.
*Harga Hubungi CS
>