• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Beranda » 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi » Maintenance » Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS)
zoom preview activate zoom

Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS)

Rp 11.950.000
Stok Tersedia
Kategori Maintenance, Project, Q-HSE

15 – 17 April 2026, Jakarta

04 – 06 Agustus 2026, Jakarta

09 – 11 November 2026, Jakarta

Best Western Senayan, Jakarta

Instructor: Ir. Alfia Djabar

 

Tentukan pilihan yang tersedia!

Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS)

BACKGROUND:

HAZOP means hazard studies (HAZARD) & Operability. It is a systematic method of analysis of the operability parameters deviations using a specific vocabulary. The required documents in order to accomplish the study are the equipment sketches (PID, PFDs) and a process description.

HAZID- is a utilized technique for the identification of the significant hazards related to an operational activity. The study is based on key-words such as Control philosophy/ Flammable/ Toxic materials Hazards related to Electricity/ Security hazards/ Health hazards/ Hazards related to Height Safety Equipment – State of the Art/Operation philosophy (Manning, Training, etc.)

 

OBJECTIVES:

Upon completion of this course participants will:

  • Understand the concept of risk and the risk management process
  • Be able to provide a framework for HAZOP within risk assessment and an HSE Management System
  • Be able to review the role of HAZOP within HSE project plans
  • Be able to increase familiarity with HAZOP protocol, logic, structure and methodology
  • Be able to describe the role and structure of the HAZOP Team and procedures
  • Be able to introduce the role, responsibilities and conduct of a HAZOP Team Leader

Be able to provide sufficient hands-on experience in the application of HAZOP to different processes and systems

COURSE OUTLINE:

  1. HAZOP Method:
    • HAZOP study Assumptions; HAZOP Review Applications; Ideal HAZOP Review Reference Data; Credible Scenarios or Causes; Non-Credible Scenarios or Causes; HAZOP Technical Suggestions; HAZOP Review Suggestions; HAZOP Recommendations and reporting; Administrative Controls; Engineering Controls; Approaches of Assigning Protection layers; Performance Based Approach; Prescriptive Approach API-RP-14C; HAZOP Workshop
  1. HAZARD Identifications
    • Hazard Management Process; Factors Increases the Hazards Potential for Process Industries; Risk; Consequences; Voluntary and Involuntary Risk; Tolerable Risk in the industries; Evaluating the Risk; ALARP; Risk Matrices; Evaluating the Frequency; Evaluating the Severity; Evaluating the Overall Risk; Principals of Protective Measures; Risk reduction; Protection Layers; Prevention Layers; Mitigation Layers; Initiating event; Process Deviation; Loss of Containment or Release of Energy; Undesirable Events; Process Controls Vs Safety Controls; Separation of Process Control system and Safety control System
  1. HAZARD Analysis:
    • Risk Criteria; Estimating Likelihood; Failure Modes; Safe Failures; Dangerous Failures; Detected/Undetected Failures; Random failures; Common Cause Systematic failures; Hazard Rate; Probability of Failure on Demand (PFD); Safety Instrumented System(SIS); Role of (SIS); Safety Integrity Requirement; Safety Integrity Level (SIL); Determining Safety Integrity Level (SIL); Risk Reduction and Reliability Assessment; Reliability Analysis; Voting And Redundancy; Diversifications; Risk Graph; Layer of Protection Analysis (LOPA); (LOPA) Procedure; Independent Protection Layers (IPLs); Fault Tree Analysis (FTA); Events and Gates
  1. Case Study

ABOUT THE COURSE LEADER:

Ir. Alfia Djabar, Facilitator for HAZOP, HAZID and SIL Classification study. Working experiences more than 30 years in oil & gas industries; 13 years at Chevron Pacific Indonesia in Duri Riau, 12.5 years at several engineering consultant in Jakarta with various positions (facilities engineer, process engineer, project engineer and project manager), and full time Facilitator since January 2018. Lead HAZOP, HAZID and SIL workshops more than 105 times for upstream oil & gas facilities, Pertamina refineries, detergent plant, and geothermal facilities. Experienced Excel VBA programmer and have developed dozen engineering calculation and data management: 1) control valve sizing (gas & liquid), 2) PSV sizing, 3) 2-phase and 3-phase separator sizing (vertical an horizontal), 4) Single & network hydraulic pipeline (gas & liquid), 5) Gas pipe noise prediction, 7) Employee timesheet for engineering projects, 8) Cause & Effect for searching and finding, 9) HAZOP and SIL Workbook packaged

Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS)

Produk Terkait

Hazard Analysis Critical Control Point (HACCP) & Culinary

BACKGROUND: Hazard Analysis Critical Control Point (HACCP) & Culinary Makanan yang aman & sehat sangat penting bagi karyawan untuk mendapatkan nutrisi yang sesuai. Makanan yang dimakan tidak boleh membahayakan konsumennya. Baik melalui faktor biologis, kimiawi atau melalui kontaminan lainnya. Melalui food safety dan kualitas yang dikontrol, akan menjamin didapatkannya makanan yang aman, baik melalui seluruh…

Rp 6.950.000
Tersedia

Spare Parts Management

Background Spare parts merupakan elemen kritis dalam mendukung keandalan operasi, efektivitas pemeliharaan, dan ketersediaan aset di industri manufaktur, migas, pembangkit, dan petrokimia. Pengelolaan spare parts yang tidak optimal dapat menyebabkan downtime tinggi, pembengkakan biaya inventori, serta risiko kekurangan material kritis. Melalui sistem Spare Parts Management yang terencana dan terintegrasi, perusahaan dapat memastikan ketersediaan suku cadang…

Rp 7.950.000
Tersedia

Perencanaan Strategi Pemeliharaan Peralatan Pembangkit

BACKGROUND: Perencanaan Strategi Pemeliharaan Peralatan Pembangkit merupakan faktor penting dalam bisnis pembangkitan. Pemeliharaan peralatan pembangkit itu sendiri merupakan suatu kegiatan pekerjaan perawatan yang dilakukan terhadap peralatan dengan tujuan agar peralatan tersebut dapat dioperasikan secara maksimal, andal, efisien, aman dan dapat mencapai lifetime (umur pakai) sesuai dengan yang direncanakan. Peralatan dalam sistem tenaga listrik perlu dipelihara…

Rp 7.950.000
Tersedia

Engineering Cost Estimate

BACKGROUND: Definisi Cost Engineering menurut AACE (American Association of Cost Engineer) adalah “suatu bidang engineering, yang meliputi penerapan prinsip-prinsip ilmiah dan teknik, dengan menggunakan pengalaman dan pertimbangan engineering dalam masalah estimasi biaya, pengendalian biaya dan ekonomi teknik“. Pada saat cost engineering belum berkembang perhitungan biaya konstruksi selalu mengalami penyimpangan yang cukup besar. Merespon semua kondisi…

Rp 7.950.000
Tersedia

Production Safety System

BACKGROUND: Risks yang bisa terjadi pada semua fasilitas produksi oil/gas di darat dan di lepas pantai pada umumnya: kebakaran atau ledakan; masalah lingkungan, kerusakan alat produksi, & cedera pada orang atau personel. Tujuan dari desain sistem keselamatan produksi adalah untuk mengurangi risiko bahaya yang teridentifikasi ke tingkat yang wajar dan diantisipasi dengan baik. Pembahasan akan…

Rp 7.950.000
Tersedia

Proactive Maintenance

BACKGROUND: Proactive maintenance is a maintenance strategy that aims to identify and fix the reasons for equipment failure before it happens. The goal of proactive maintenance is to increase asset reliability and reduce the risk of downtime. Wear and tear is a normal part of equipment life cycles. However, a solid proactive maintenance strategy can…

Rp 7.950.000
Tersedia
Index
Chat with us on WhatsApp
Chat with Us