- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Power Plant Performance Test
Rp 7.950.000| Stok | Tersedia |
| Kategori | 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi, Maintenance, Manajemen, Power Generation, Production Operation |
13 - 15 Juli 2026, Bandung
16 - 18 November 2026, Bandung
Intructor: Dr. Willy Adriansyah, ST, MM
Power Plant Performance Test
BACKGROUND:
The main reasons to conduct a power plant performance test are:
- Identify the baseline performance of the power plant in different operating cases
- Quantify the prior/after performance improvement due to a major maintenance outage.
- Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good” actions are required.
A performance test is usually carried out after the construction or retrofit of a plant. It verifies that the plant can achieve its guaranteed parameters and function as intended. This 3-day training is designed to provide participants with the knowledge of power plant testing evaluation & efficiency improvements.
OBJECTIVES:
- Demonstrate working knowledge of terminology associated with Plant efficiency
- Describe the terms of Thermodynamic
- Define the terms of entropy, enthalpy, latent heat, sensible heat rate, etc.
- Thermodynamic process involves in each component of power plant
- Describe how changes in heat rate affect operating cost
- Describe the basic principle of boiler, steam turbine & heat exchanger
- Describe how boiler, turbine and heat exchanger affect heat rate
- Common areas of efficiency loss in power plant
- Describe the principle of plant efficiency testing using ASME Performance Test Code
- Data evaluation & plan for improvements
RECOMMENDED PARTICIPANTS:
- Power Plant Operators
- Process & Engineering Staffs
- Management & Business Staffs involved in Power Plant Aspects
COURSE OUTLINE:
- ASME Performance Test Code
- Thermodynamic
- Steam Generators: theory, heat transfer, fuel consideration, auxiliary equipment, etc
- Steam Generator Combustion Theory & Equipment: theory & equations, fuel analysis, combustion equipment, efficiency testing & monitoring
- Steam Turbine: theory, type, construction detail, valves, efficiency
- Factors influencing Turbine Efficiency: steam condition, exhaust loss, size, configuration, mode of operation, mechanical condition, etc.
- ASME Performance Test Code for Turbine: practical aspects of turbine testing, thermal kits, generator corrections, calculation of change in heat rate, calculation of primary flow, diagnosis of turbine problems, example of simplified test calculation, example of testing program
- Power Plant Heat Exchanger: heat transfer theory, condenser testing
- Factors Affecting Heat Exchanger Performance: low circulating water flow rate, high air leakage, fouled tubes, high inlet water temperature, reduction in load, etc
- Centrifugal Pump: theory, design & construction, testing & monitoring operation
- Measuring Equipment: temperature, pressure, flow, electrical, flue gas, data logging & computer
- Evaluation: statistics, test design, data analysist & trending
ABOUT THE COURSE LEADER:
Dr. Willy Adriansyah, ST, MM graduated from Bandung Institute of Technology specializing on energy conservation. Post graduate program also obtained from ITB while the Doctoral is from Norway.
In addition to his duty as a lecturer, he has got abundant of real industrial experiences especially in power generation & oil/gas companies. Since 2013 he has completed many power generation performance tests; Cilegon, Lumut Balai, Ulu Belu, Dieng, Patuha and also other piping & coal handling optimization related to power generation.
Clients uses his services such as: PT. Indonesia Power, PT. Star Energi, PT. PLN, Total Indonesie, PT. Pama Persada, Chevron & Pertamina.
Power Plant Performance Test
Wells Performance & Surveillance
BACKGROUND: Effective monitoring and surveillance of well performance are critical to optimizing production, identifying operational inefficiencies, and maintaining the integrity of wells over time. Wells Performance & Surveillance is a comprehensive approach that involves the collection, analysis, and interpretation of data from wells to improve performance and decision-making. This training provides participants with the knowledge…
Rp 13.950.000
Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS)
BACKGROUND: HAZOP means hazard studies (HAZARD) & Operability. It is a systematic method of analysis of the operability parameters deviations using a specific vocabulary. The required documents in order to accomplish the study are the equipment sketches (PID, PFDs) and a process description. HAZID- is a utilized technique for the identification of the significant hazards…
Rp 11.950.000
Reliability Management
BACKGROUND: Is your equipment frequently breaking down? Is your maintenance planning process becoming chaotic? Are you failing to determine when to service assets to maximize their lifespan? Almost 80% of companies are in the same boat, experiencing unplanned downtime at least once every three years. Reliability management is a crucial aspect of any organization’s operations….
Rp 7.950.000
Gas Hazard & Measurement
BACKGROUND: Gas Hazard & Measurement is a training program designed to address gas as a highly flammable material, requiring special control and handling. A solid understanding of anticipating and measuring potential gas hazards is essential before utilizing it for various purposes. . Numerous fires, explosions, and poisoning incidents occur due to negligence in recognizing gas…
Rp 7.950.000
BOILER (Pengoperasian Burner System: Coal, Main Oil Gun, Tiny Oil Gun)
BACKGROUND: Pada Pembangkit berbahan bakar batubara, proses start awal boiler tidak bisa langsung menggunakan batubara karena temperatur di furnace masih rendah. Untuk menaikkan temperatur furnace maka digunakan bahan bakar HSD (High Speed Diesel) melalui alat main oil gun. Pada main oil gun terdapat dua saluran utama yaitu saluran bahan bakar HSD dan saluran atomizing air….
Rp 7.950.000
Balance Score Card, Strategy and Implementation
BACKGROUND: Balance Score Card, Strategy and Implementation merupakan elemen penting dalam manajemen kinerja perusahaan. Pendekatan ini membantu perusahaan dalam mengevaluasi kinerja dengan memperhatikan rencana strategis untuk masa depan. Manajemen kinerja yang efektif bergantung pada metodologi yang tidak hanya fokus pada hasil saat ini tetapi juga mempertimbangkan investasi jangka panjang. Dalam Balance Scorecard, perspektif seperti investasi…
Rp 6.950.000
>