- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Dudus Kudus
Factory Acceptance Test Training
Background: Factory Acceptance Test (FAT) adalah tahapan kritis dalam pengadaan peralatan industri yang memastikan bahwa peralatan yang dibeli memenuhi spesifikasi kontrak sebelum dikirimkan ke lokasi proyek. Biaya perbaikan cacat yang ditemukan di pabrik jauh lebih rendah dibandingkan yang ditemukan setelah instalasi. Kompetensi dalam perencanaan, pelaksanaan, dan witnessing FAT sangat penting untuk melindungi investasi peralatan. Objectives:…
Rp 7.950.000
Advance Vibration Analysis
Background: Basic Vibration Training provides just the basic knowledge of vibration, while Advanced Vibration Analysis should have wider spectrums. Some of those wider spectrums are: root-cause analysis/diagnosis & precise corrective recommendations; report writing & recommendation. Participants will be trained not only to recognize vibration symptoms, but to accurately diagnose root causes and provide precise corrective…
Rp 10.950.000
Project Engineering Management
Background: Kompleksitas proyek industri saat ini—khususnya di sektor minyak & gas, petrokimia, pembangkit listrik, dan pertambangan—menuntut integrasi yang sangat presisi antara keahlian rekayasa teknis (engineering) dan kedisiplinan eksekusi proyek (project management). Banyak proyek mengalami kegagalan kinerja bukan karena kesalahan kalkulasi teknis semata, melainkan akibat kurangnya jembatan yang kuat (interface) antara tim engineering dengan fungsi procurement,…
Rp 7.950.000
Site Acceptance Test
Dengan dilakukannya Site Acceptance Test (SAT), maka end user lebih pastik bahwa Equipment atau alat siap beroperasi di site. Setelah equipment selesai diproduksi dan melewati Factory Acceptance Test (FAT), perjalanan equipment belum selesai. Equipment masih harus dikirim ke lokasi proyek, dipasang, diintegrasikan dengan sistem lain, dan dipastikan dapat berfungsi dalam kondisi aktual di site. Pada tahap inilah…
oleh imam
Mastering Production Sharing Contract (PSC) & Project Economics
– 24 September, 2026 at Pullman Bandung Grand Central***** This course is designed so that participants can have more interactive discussions with the instructor. This two-day intensive course provides the participants with a comprehensive understanding of Production Sharing Contracts (PSC) and explain what makes Indonesian PSC different from global PSC. The discussion focus on the…
Rp 14.950.000
Contract Life Cycle Management
Background: Contract Management has become a critical business function for organizations seeking to optimize operational performance, ensure regulatory compliance, minimize contractual risks, and maximize value throughout the entire contract lifecycle. In the oil/gas, mining & capital-intensive industries, where contracts often involve high-value procurement, construction, equipment rental, engineering services, logistics, and long-term operational agreements, effective contract…
Rp 7.950.000
User Acceptance Test
User Acceptance Test (UAT) adalah salah satu langkah untuk memastikan bahwa peralatan, barang atau sistem yang kita pesan siap digunakan oleh User. Setelah suatu sistem atau aplikasi selesai dikembangkan dan melewati berbagai pengujian teknis, masih ada satu pertanyaan penting: apakah sistem tersebut benar-benar dapat digunakan dan diterima oleh pengguna? UAT biasanya dilakukan setelah FAT (Factory Acceptance…
oleh imam
Inspection Testing dalam FAT
Inspection dan Testing dalam FAT. Factory Acceptance Test umumnya tidak hanya terdiri dari satu jenis pengujian. Ada beberapa tahapan yang saling melengkapi dimana yang diuji mulai daro dokumentasi teknis, inspeksi, pengujian atas fungsi-fungsi yang diminta, dan uji kinerja. 1. Document Review Sebelum melakukan physical test, dokumen equipment perlu diperiksa. Contohnya: Approved drawings Datasheet Material certificate Calibration…
oleh imam
Factory Acceptance Test
Dalam proyek engineering, procurement, fabrication, dan construction, pembelian equipment bukan sekadar memastikan barang sudah selesai dibuat oleh manufacturer. Equipment tersebut juga harus dipastikan memenuhi spesifikasi teknis, drawing, standard, serta persyaratan yang telah disepakati dalam kontrak. Factory Acceptance Test (FAT) dilakukan untuk memastikan bahwa equipment siap sebelum dikirim ke Site. Di sinilah Factory Acceptance Test (FAT)…
oleh imam
>