Overview

Power transmission is crucial to the power sector, as important as power generation itself. The electricity generated in power stations must be transported over long distances to reach load centers using transmission lines and towers. Expanding the Transmission & Distribution (T&D) network to meet growing demand is essential for providing a reliable, stable, and secure power supply. This requires optimal and economical planning of the transmission system. Today, power transmission utilities rely on standard designs to construct transmission lines, minimizing capital costs. However, delays in transmission projects can significantly hinder economic development. Challenges such as layout changes, land management, contractor issues, financing, and contract disputes commonly arise during the construction phase of transmission lines.

This training provides the essential knowledge required to manage power line construction from electrical, civil, and HSE perspectives.

Course Outline

Line Construction

  • Understand the requirements for line construction, including poles, towers, conductors, and insulators.
  • Learn about BIL of insulators, common failures, and the principles of splicing and terminating conductors.

Street Lighting

  • Explore various street lighting systems, including their connection, maintenance, and troubleshooting.

Line Construction for Poles

  • Learn about the application of different types of anchors and stringing methods.
  • Understand the sagging requirements and methods for overhead conductors.

Survey & Profiling of Transmission Lines

  • Gain insights into foundation work for towers, critical checkpoints in tower erection, and stringing operations.
  • Overview of tower design, input assumptions, and their impact on tower longevity.
  • Learn about disaster management, emergency restoration, and safety measures during transmission line construction.

System Grounding

  • Differentiate between earth grounding systems and neutral return systems.
  • Understand the function of ground rods and the hazards of open neutral or ground conductors.

Underground Distribution

  • Identify and explain the components and equipment in primary and secondary underground systems.
  • Learn about testing, identification, mapping, and switching for new underground installations.

Circuit Protection and Switching

  • Identify and understand the operation of circuit protection and switching equipment.
  • Explore the basic operation of fuses, sectionalizers, oil circuit breakers, arresters, and relay operations.
WHO SHOULD ATTEND? 
  • Electric Engineer / Supervisor/ Superintendent
  • Plant Maintenance Engineer/ Supervisor/ Superintendent
  • Plant and Process Engineer/ Supervisor/ Superintendent
  • Safety and Lost Prevention Engineer/ Supervisor/ Superintendent
  • Electrical and Mechanical Design Engineer

 TRAINER:

Ali Mashar, M.Eng.Sc., IPU

Power Line Construction

Produk Terkait

Failure Mode and Effect Analysis (FMEA)

BACKGROUND: Failure mode and effect analysis adalah alat yang sangat bermanfaat untuk mencegah kegagalan proses dan produk. FMEA adalah metoda untuk mengidentifikasi dan mengevaluasi kegagalan potensial, menentukan tingkat resiko dari dari kegagalan dan skala prioritas untuk mengambil tindakan yang diperlukan. FMEA dapat menekan biaya karena kegagalan produk. Lebih dari itu, FMEA dapat berfungsi sebagai database…

Rp 7.950.000
Tersedia

Power Generator Excitation System

BACKGROUND: The excitation system plays a crucial role in ensuring the stability, reliability, and efficiency of power generators. By controlling the generator’s output voltage and reactive power, the excitation system helps maintain the performance and synchronization of the power grid. A well-maintained and properly operated excitation system is essential to prevent system failures, enhance power…

Rp 7.950.000
Tersedia

Electrical & Mechanical Safety

BACKGROUND: Sebagian besar penyebab kebakaran di perkotaan dan di berbagai perusahaan adalah karena listrik, dimana besarnya kerugian secara material selama tahun 2003 adalah sebesar Rp.23 Milyar! Hal ini merupakan kerugian yang sangat besar dan dapat terjadi di perusahaan mana saja apabila tidak memperhatikan kaidah-kaidah keamanan, khususnya dalam hal ini di bidang electrical & mechanical. Standar…

Rp 7.950.000
Tersedia

Pemeliharaan Motor Listrik

BACKGROUND: Motor listrik merupakan komponen penting dalam berbagai aplikasi industri, dan pemeliharaannya sangat penting untuk memastikan efisiensi, mengurangi konsumsi energi, serta meminimalkan downtime. Pelatihan Pemeliharaan Motor Listrik bertujuan untuk memberikan pengetahuan dan keterampilan praktis kepada teknisi dan insinyur dalam merawat motor listrik secara efektif, dengan fokus pada pemeliharaan rutin, diagnostik kerusakan, dan langkah pencegahan untuk…

Rp 7.950.000
Tersedia

Substitution Equipment & Control Relay

BACKGROUND: In modern power generation and industrial systems, ensuring the reliability and continuity of operations is paramount. Substitution Equipment & Control Relay play a critical role in maintaining system integrity, providing backup solutions, and automating essential processes. As equipment ages or technology evolves, it becomes necessary to replace or upgrade these components to avoid system…

Rp 7.950.000
Tersedia

Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS)

BACKGROUND: HAZOP means hazard studies (HAZARD) & Operability. It is a systematic method of analysis of the operability parameters deviations using a specific vocabulary. The required documents in order to accomplish the study are the equipment sketches (PID, PFDs) and a process description. HAZID- is a utilized technique for the identification of the significant hazards…

Rp 11.950.000
Tersedia

Table of Contents

Index
Chat with us on WhatsApp
Chat with Us