• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
zoom preview activate zoom

Technical Project Documentation Management

Rp 5.500.000
Stok Tersedia
Kategori Maintenance, Project

Bandung, 18-19Juni, 2025

Instructors: Ir. Anita Sampratiwi & Heni Hendarsih, S.Hum - Field Practitioners

Tentukan pilihan yang tersedia!

Technical Project Documentation Management

BACKGROUND:

Every good project produces documentation that is well organized and easy to find. Return when information is needed to proceed to the next project phase or operation/maintenance process. It can be done manually although using software is much better. Nevertheless, it is very important that it shall exist & well managed

 

OBJECTIVES:

This is a two-day training program to improve the awareness of everyone, provide guidance & how to implement technical project documentation management which is often neglected. How proper documentation management support the life of the plant. After attending this training, participants:

  1. Will improve their awareness that project documentation is also critical aspects need attention & proper management beyond the physical achievement,
  2. Learn about document management governance, document management system & people interface from team involved in the project & post project phase,
  3. Learn to implement proper document management available, to hand over to their successor teams
  4. Will be introduced & practice using Document Management Software,
  5. Should be able to implement better project documentation with themselves and other team member involve

COURSE OUTLINE:

  1. Objectives of Project Documentation
  2. Document Life cycle during Engineering Project Phases
  • Document life cycle during the process of a technical project respiratory management
  • Planning, filing procedure, Engineering Design, construction & installation phases, hand over to Operations & Facility Engineering & Maintenance,
  • Tips & Trick
  1. Information/Document Management Governance
  • Overview of governing regulations
  • Developing comprehensive planning, proper implementation & execution
  • Human resources behavior & awareness and appropriate technology (fit for purpose).
  1. Roles & Responsibilities
  • Building the Document Management (DM) Team good understanding of the overall project process, from planning to handover to Operation & FE.
  • Collaborative communication between Team DM & Team Engineers is an important factor in achieving the ultimate goals.
  • Road Map of implementation of EDMS
  1. Document Management Process
  • Selection & use of the right Document Management System (DMS)
  • Overview of the Electronic Document Management System (EDMS): functions needed & the appropriate system selection strategy
  1. Electronic Document Management System (EDMS)
  • Session-1: Explanation of the functions directly, as well as a practical simulation of using the EDMS, both from the user & administration sides
  1. Hands On/Practice of Using EDMS

Session-2: Practical simulation of using EDMS, both from the user & admin sides, with case examples.

ABOUT THE COURSE LEADER:

Ir. Anita Sampratiwi & Hani Hendarsih S.Hum, are practitioner in Project Documentation Management (PDM).

They started her career as a field geologist in Chevron where she dealt with bunch of geothermal & oil wells technical data & subsurface data to manage. Finishing her field assignment, she has than eventually more than 20 years of experiences in Data Management, IT, Information Management, Change Management & Communication, &Business Process improvement area. Holds extensive experiences in establishing, managing, &improving process and organization in various Departments in Indonesia & abroad. The largest project handled was developing & improving project documentations management in EPCI project in East Kalimantan starting from development drilling to EPCI to hand over to operation teams.

Technical Project Documentation Management

Produk Terkait

Power Plant Performance Test

BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…

Rp 7.950.000
Tersedia

Reliability Management

BACKGROUND: Is your equipment frequently breaking down? Is your maintenance planning process becoming chaotic? Are you failing to determine when to service assets to maximize their lifespan? Almost 80% of companies are in the same boat, experiencing unplanned downtime at least once every three years. Reliability management is a crucial aspect of any organization’s operations….

Rp 7.950.000
Tersedia

Logistics & Supply Chain Management

BACKGROUND: Logistics & Supply Chain Management is just like a blood vessel in human life. It plays key roles to deliver everything to each components of the body. With increasing competition around the globe, supply chain management is both a challenge and an opportunity for companies. Hence a strong understanding of supply chain management concepts…

Rp 7.950.000
Tersedia

Advance Vibration Analysis

Background: Basic Vibration Training provides just the basic knowledge of vibration, while Advanced Vibration Analysis should have wider spectrums. Some of those wider spectrums are: root-cause analysis/diagnosis & precise corrective recommendations; report writing & recommendation. Participants will be trained not only to recognize vibration symptoms, but to accurately diagnose root causes and provide precise corrective…

Rp 10.950.000
Tersedia

Failure Mode and Effect Analysis (FMEA)

BACKGROUND: Failure mode and effect analysis adalah alat yang sangat bermanfaat untuk mencegah kegagalan proses dan produk. FMEA adalah metoda untuk mengidentifikasi dan mengevaluasi kegagalan potensial, menentukan tingkat resiko dari dari kegagalan dan skala prioritas untuk mengambil tindakan yang diperlukan. FMEA dapat menekan biaya karena kegagalan produk. Lebih dari itu, FMEA dapat berfungsi sebagai database…

Rp 7.950.000
Tersedia

Piping Design and Fabrication

BACKGROUND: Sistem perpipaan (piping system) merupakan komponen penting dalam industri minyak dan gas, petrokimia, pembangkit listrik, dan industri proses lainnya. Piping Design and Fabrication (desain dan fabrikasi perpipaan) yang tepat dari sistem perpipaan sangat menentukan efisiensi, keselamatan, dan umur layanan instalasi tersebut. Oleh karena itu, pemahaman mendalam mengenai standar, perhitungan desain, pemilihan material, teknik fabrikasi,…

*Harga Hubungi CS
Tersedia
Chat with us on WhatsApp
Chat with Us