- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Project Control and Scheduling Using MS Project
Rp 7.950.000| Stok | Tersedia |
| Kategori | Engineering, Manajemen, Project |
24 - 26 Juni 2026, Bandung
21 - 23 Oktober 2026, Bandung
Instructor: Dr. Djadja Achmad Sardjana S.T., M.M.
Project Control and Scheduling Using MS Project
BACKGROUND:
Aktivitas proyek dapat terjadi di segala bidang di perusahaan, baik proyek fisik (infrastruktur) seperti proyek pembelian peralatan, pemasangan fasilitas, pendirian pabrik baru maupun non fisik seperti proyek pengembangan produk baru,perancangan struktur organisasi, pembuatan sistem informasi manajemen dan peningkatan produktivitas perusahaan. Realitas di lapangan menunjukkan bahwa sering terjadi kegagalan dalam menjalankan proyek disebabkan oleh adanya perencanaan, pelaksanaan dan pengendalian proyek yang tidak tepat.
Merencanakan, melaksanakan dan mengendalikan suatu proyek merupakan kegiatan yang relative kompleks dan sulit dilakukan karena dituntut untuk memperhatikan berbagai aspek seperti waktu, biaya, sumberdaya, perkembangan pencapaian tujuan dan masih banyak lagi. Training ini akan mempelajari tentang bagaimana mengelola sebuah proyek dalam hal perencanaaan (planning), pelaksanaan (updating) dan pengendalian (controlling). Aplikasi Software Microsoft Project akan diberikan untuk mempermudah dalam penjadwalan dan pengendalian proyek terutama untuk proyek yang cukup kompleks.
OBJECTIVES:
Maksud dan tujuan diselenggarakannya Pelatihan Project Management dengan Microsoft Project agar peserta dapat:
- Memahami tentang ruang lingkup manajemen proyek dan aktivitas yang terjadi didalamnya.
- Memahami dan mampu membuat penjadwalan proyek dan pengalokasian sumberdaya.
- Memahami dan mampu membuat membuat baseline/target plan sebuah proyek.
- Memahami dan mampu melakukan updating dan mempercepat sebuah proyek.
- Memahami dan mampu menjalankan Software Microsoft Project untuk membantu pengelolaan proyek.
RECOMMENDED PARTICIPANTS:
Peserta sebaiknya dari team yang terkait pelaksana project, seperti:
- Project Manager
- Project Planner, Project Control
- Admin & Reporting Project
- Procurement
- Pihak lain yang terkait dalam pelaksanaan pekerjaan yang memerlukan control waktu & biaya secara akurat.
COURSE OUTLINE:
- Ruang lingkup dan Pemahaman manajemen proyek.
- Perencanaan proyek dan Pendefinisian pekerjaan: Rencana induk proyek, pendefinisian pekerjaan (work breakdown Structure), integrasi dengan organisasi.
- Project Creation & membuat base line
- Penjadwalan proyek: Teknik penjadwalan (Bar Chart, PERT, CPM, PDM), Metode Lintasan kritis dengan Microsoft Project.
- Penempatan sumberdaya: teknik penempatan sumberdaya dengan perataan (leveling) dengan Microsoft Project.
- Biaya proyek: Biaya langsung, biaya tak langsung, teknik estimasi biaya, cara pembayaran bertahap (termin).
- Pelaksanaan kegiatan: membuat baseline/target dan tracking kegiatan dengan Microsoft Project.
- Pengendalian jadwal: Analisis penyimpangan jadwal dan biaya, proyeksi biaya dan jadwal akhir, konsep nilai hasil dengan Microsoft Project.
- Mempercepat waktu penyelesaian: percepatan jadwal, kegiatan tumpang tindih, saling tukar tenaga kerja, penambahan sumberdaya kritis dengan Microsoft Project.
- Case study: Kasus-kasus riil di lapangan dan troubleshooting.
ABOUT THE COURSE LEADER:
Dr. Djadja Achmad Sardjana S.T., M.M Senior Executive on Strategic Planning/ Business Expansion/ Project/ Process/ Quality/ Knowledge Management/ Human Capital Learning, Corporate University and Operation Management At AT&T/Lucent, Ariawest/AT&T Wireless, M-Web, Motorola and Sampoerna Telekom
Management strategist with a 20+ year record of achievement and demonstrated business success in highly competitive markets. Have strength on driving growth of company revenues and improving business performance. Exceptional executive, mentor and coach with capability to building company learning organization and knowledge management, new business process, securing customer loyalty, and forging strong relationships with external business partners.
Project Control and Scheduling Using MS Project
Hazard & Operability Studies (HAZOPS) & Hazard Identification Study (HAZIDS)
BACKGROUND: HAZOP means hazard studies (HAZARD) & Operability. It is a systematic method of analysis of the operability parameters deviations using a specific vocabulary. The required documents in order to accomplish the study are the equipment sketches (PID, PFDs) and a process description. HAZID- is a utilized technique for the identification of the significant hazards…
Rp 11.950.000
Engineering Cost Estimate
BACKGROUND: Definisi Cost Engineering menurut AACE (American Association of Cost Engineer) adalah “suatu bidang engineering, yang meliputi penerapan prinsip-prinsip ilmiah dan teknik, dengan menggunakan pengalaman dan pertimbangan engineering dalam masalah estimasi biaya, pengendalian biaya dan ekonomi teknik“. Pada saat cost engineering belum berkembang perhitungan biaya konstruksi selalu mengalami penyimpangan yang cukup besar. Merespon semua kondisi…
Rp 7.950.000
Gearbox Selection, Maintenance & Troubleshooting
BACKGROUND: Gearbox Selection, Maintenance & Troubleshooting are essential aspects of ensuring optimal performance in mechanical power transmission systems across industries such as manufacturing, energy, mining, and transportation. Gearboxes play a critical role in powering machinery, and their reliability directly impacts the efficiency and productivity of operations. However, selecting the right gearbox, maintaining it properly, and…
Rp 7.950.000
Analisa & Evaluasi Perencanaan Strategi Pemeliharaan Pembangkit
BACKGROUND: Tata kelola pemeliharaan unit pembangkitan yang sistematis merupakan hal penting dalam menjalankan seluruh proses bisnis untuk meningkatkan kinerja perusahaan sekaligus meningkatkan daya saing. Tata kelola pemeliharaan pembangkitan yang dilakukan secara efektif dapat menjadikan perusahaan terdepan dalam bidang pembangkitan. Pemahaman proses tata kelola pemeliharaan sistem pembangkit harus dilakukan secara rasional dan ekonomis dengan memperhatikan mutu…
Rp 7.950.000
Rotating Equipment & Machineries
BACKGROUND: Rotating equipment & machineries, or turbomachinery, involves a component that transfers energy between working fluids and the machine. This transfer can occur from the rotor to the fluid, making it a pump or a fan, or from the fluid to the rotor, making it a turbine. Examples of such machinery include fans, pumps, compressors,…
*Harga Hubungi CS
IT Strategic Plan, Operation & Tactical
BACKGROUND: IT Strategic Plan, Operasional & Taktis di banyak korporasi dan organisasi masih dipandang sebagai sekadar isu teknis-operasional. IT sering dianggap sebagai pusat biaya (cost center) yang sulit diukur manfaatnya, dengan risiko investasi yang tinggi. Akibatnya, banyak pemangku kebijakan sepenuhnya bergantung pada vendor atau konsultan eksternal, tanpa memiliki rencana strategis IT yang terintegrasi dengan rencana…
Rp 7.950.000
>



