Pengoperasian BFPT, Protection & Supervisory System
BACKGROUND:
Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan oleh boiler. BFPT dapat berbentuk pompa sentrifugal atau jenis perpindahan positif, yang memainkan peran krusial dalam menjaga efisiensi dan keselamatan operasi boiler.
Pelatihan ini dirancang untuk memberikan pemahaman mendalam tentang sistem proteksi dan pengawasan BFPT, dengan fokus pada prinsip kerja turbin, konfigurasi, komponen, serta sistem pendukung dan pengamanannya. Peserta akan dipersiapkan untuk memahami cara kerja, pengoperasian, dan prosedur pemeliharaan yang diperlukan untuk memastikan kinerja optimal dan aman dari BFPT dalam berbagai kondisi operasi.
OBJECTIVES:
Setelah mengikuti pelatihan peserta diharapkan mampu:
- Memahami prinsip dasar operasi turbin.
- Mengoperasikan BFPT dengan efektif dan aman.
- Menganalisis dan menerapkan sistem proteksi.
- Memahami sistem supervisory dan monitoring.
- Melaksanakan tindakan pemeliharaan dan troubleshooting.
- Meningkatkan kesadaran terhadap keselamatan operasional.
RECOMMENDED PARTICIPANTS:
Yang dapat mengikuti Training ini: para teknisi, operator maupun supervisor yang bekerja dibidang ketenagalistrikan di industri terutama dibidang pembangkitan dan Distribusi Tenaga Listrik.
COURSE OUTLINE:
- Prinsip kerja turbine uap
- Jenis dan konfiguras
- Komponen Turbine
- Stationary parts, rotors, bearings and journals, couplings, turning gear, steam control valves and protective devices
- Sistem & alat bantu
- Sistem proteksi turbine
- Front Standard
- Overview of components and systems
- Turbine Controls
- Description
- Programming
- Operation
- Monitoring dan supervisory
- Turbine Support Systems
- High pressure hydraulic, control, steam seal and lubricating oil
- BFPT (Boiler Feed Pump Turbine)
- Turbine Operations
- Start-up, loading and shutdown
ABOUT THE COURSE LEADER:
Ir. Ali Mashar, M.Eng.Sc., IPU graduated from New South Wales University (UNSW) Sydney Australia. His core expertise is power and control or electrical engineering. He used to be Head Energy Conversion Engineering of Politeknik ITB (POLBAN) and lecturer. He is also head of laboratory of energy engineering PEDC.
Pal Ali Mashar has delivered in-house & public training classes since 2010 covering specific topics on electrical & control system, energy conservation. Companies where he shares his expertise are local & multinational companies such as: Indonesia Power, Pemda Papua, PT. Badak, Cogindo, Star Energi, Chevron, Freeport and some others.
Other than teaching he has done many real projects related to power generation and many energy audits.
Pengoperasian BFPT, Protection & Supervisory System
Advance Pipeline Construction and Operation
BACKGROUND: Onshore pipeline facilities play a strategic role in transporting hydrocarbons safely and efficiently from production fields to processing and distribution points. The success of a pipeline system is determined not only by its design quality, but also by the effectiveness of construction management practices and the reliability of day-to-day operations. Inadequate integration between design,…
Rp 7.950.000
Electrical Safety, Theory & Application
BACKGROUND: Electrical safety is vital in both workplace and home environments. While we use electricity daily, the risks are significantly higher in work settings, especially when high-voltage equipment is involved. Workers like engineers, electricians, technicians, and power line workers are directly exposed to electrical hazards. Office workers and salespeople, though less directly exposed, may still…
Rp 7.950.000
0%
P&ID dan Logic Diagram Pembangkit
BACKGROUND: Logic diagram menyajikan detail yang secara skematis memperlihatkan semua instrument peralatan yang akan mempengaruhi berlangsungnya pengaturan yang bersifat sekuensial yaitu peralatan-peralatan yang berpengaruh dalam berlangsungnya pengaturan seperti Switch, Timer, dan memor yang mempunyai keluaran sebagai pengenali/menjalankan Pompa, Katup, Compresor dan sebagainya. Schematic diagram dibuat untuk memperlihatkan semua peralatan listrik yang digunakan meliputi shematic control…
Rp 7.950.000 Rp 7.950.000
Process Safety Management
BACKGROUND Process Safety Management (PSM) atau Manajemen Keselamatan Proses (MKP) dilaksanakan oleh perusahaan-perusahaan atau industri kimia/ petro-chemical, minyak & gas bumi (migas) setelah beberapa kejadian fatal yang telah banyak menelan korban jiwa dan harta benda seperti kasus Flixborough (Juni 1974), Seveso (Juli 1976), Bhopal (Desember 1984), Piper Alpha (Juli 1988), dan lain sebagainya . Dalam…
Rp 7.950.000
Process Safety & Asset Integrity Management System
Background: Process Safety & Asset Intergrity Management System, biasanya merupakan dua hal yang terpisah. Padahal keselamatan proses (Process Safety) dan integritas aset (Asset Integrity) merupakan fondasi utama dalam industri migas yang berisiko tinggi. Kegagalan pengelolaan kedua aspek ini bisa menimbulkan kerugian besar, baik dari sisi manusia, lingkungan, maupun bisnis. Process Safety & Asset Integrity Management…
Rp 7.950.000
Coal Dust Explosion
Background & Objectives: Coal dust explosion is one of the most hazardous risks in coal-fired power plants & coal handling facilities. Fine coal particles are highly combustible & under certain conditions, can lead to catastrophic explosions when exposed to ignition sources. The risk becomes even more critical as operations scale up & involve large quantities…
Rp 6.350.000
>