• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Beranda » 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi » Electrical » Pengoperasian BFPT, Protection & Supervisory System
zoom preview activate zoom

Pengoperasian BFPT, Protection & Supervisory System

Rp 7.950.000
Stok Tersedia
Kategori Electrical, Engineering, Mechanical, Power Generation

12 - 14 Agustus 2026, Bandung

26 - 28 Oktober 2026, Bandung

Trainer: Ir. Ali Mashar, M.Eng.Sc., IPU

Tentukan pilihan yang tersedia!

Pengoperasian BFPT, Protection & Supervisory System

BACKGROUND:

Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan oleh boiler. BFPT dapat berbentuk pompa sentrifugal atau jenis perpindahan positif, yang memainkan peran krusial dalam menjaga efisiensi dan keselamatan operasi boiler.

Pelatihan ini dirancang untuk memberikan pemahaman mendalam tentang sistem proteksi dan pengawasan BFPT, dengan fokus pada prinsip kerja turbin, konfigurasi, komponen, serta sistem pendukung dan pengamanannya. Peserta akan dipersiapkan untuk memahami cara kerja, pengoperasian, dan prosedur pemeliharaan yang diperlukan untuk memastikan kinerja optimal dan aman dari BFPT dalam berbagai kondisi operasi.

OBJECTIVES:

Setelah mengikuti pelatihan peserta diharapkan mampu:

  • Memahami prinsip dasar operasi turbin.
  • Mengoperasikan BFPT dengan efektif dan aman.
  • Menganalisis dan menerapkan sistem proteksi.
  • Memahami sistem supervisory dan monitoring.
  • Melaksanakan tindakan pemeliharaan dan troubleshooting.
  • Meningkatkan kesadaran terhadap keselamatan operasional.

COURSE OUTLINE:

  1. Prinsip kerja turbine uap
  2. Jenis dan konfiguras
  3. Komponen Turbine
    • Stationary parts, rotors, bearings and journals, couplings, turning gear, steam control valves and protective devices
  4. Sistem & alat bantu
  5. Sistem proteksi turbine
  6. Front Standard
    • Overview of components and systems
  7.   Turbine Controls
    • Description
    • Programming
    • Operation
  8. Monitoring dan supervisory
  9. Turbine Support Systems
    • High pressure hydraulic, control, steam seal and lubricating oil
  10. BFPT (Boiler Feed Pump Turbine)
  11. Turbine Operations
    • Start-up, loading and shutdown

ABOUT THE COURSE LEADER:

Ir. Ali Mashar, M.Eng.Sc., IPU graduated from New South Wales University (UNSW) Sydney Australia. His core expertise is power and control or electrical engineering. He used to be Head Energy Conversion Engineering of Politeknik ITB (POLBAN) and lecturer. He is also head of laboratory of energy engineering PEDC.

Pal Ali Mashar has delivered in-house & public training classes since 2010 covering specific topics on electrical & control system, energy conservation. Companies where he shares his expertise are local & multinational companies such as: Indonesia Power, Pemda Papua, PT. Badak, Cogindo, Star Energi, Chevron, Freeport and some others.

Other than teaching he has done many real projects related to power generation and many energy audits.

Pengoperasian BFPT, Protection & Supervisory System

Produk Terkait

HVAC Operation, Maintenance, & Troubleshooting

BACKGROUND: HVAC systems play a crucial role in maintaining optimal indoor comfort by regulating heating, ventilation, and air conditioning. A key component of these systems is the hydronic system, which uses water or other liquids for efficient heat transfer. Understanding the operation, maintenance, and troubleshooting of HVAC systems, including hydronic and refrigeration components, is essential…

Rp 7.950.000
Tersedia

Boiler Control Burner Management System

BACKGROUND: The Boiler Control Burner Management System (BCBMS) is critical for ensuring the safe, efficient, and reliable operation of industrial boilers in energy production facilities. These systems integrate advanced control technologies to optimize combustion processes, manage fuel-air ratios, and enhance energy efficiency while adhering to stringent safety standards. Proper understanding and management of BCBMS are…

Rp 7.950.000
Tersedia

Power Plant Performance Test

BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…

Rp 7.950.000
Tersedia

Operation Readiness, Hand Over & Assurance

BACKGROUND: Oil and gas facilities are among the most complex in the industry. Typically, these facilities are built by world-class EPC (Engineering, Procurement, and Construction) companies through subcontracting agreements. As a result, they must adhere to strict completion schedules. Consequently, effective collaboration among the Project, Commissioning, Operation Assurance, and Operation & Maintenance teams is essential….

Rp 7.950.000
Tersedia

BOILER (Pulverizer & Soot blower System)

BACKGROUND: Pada Pembangkit Listrik Tenaga Uap (PLTU) berbahan bakar Batu Bara, Soot Blower dan Pulverizer merupakan alat-alat yang sangat penting. Soot blower berfungsi untuk membersihkan tube pada boiler pada Heat Recovery Area (HRA) yaitu area Superheater, Economizer, Reheat, serta pada Air Heater dari kotoran/slag yang menempel. Sedangkan Pulverizer merupakan penyedia serbuk bahan bakar batu bara…

Rp 7.950.000
Tersedia

Flow Accelerated Corrosion

BACKGROUND: Flow Accelerated Corrosion (FAC) is a critical issue in industrial systems where high-velocity fluids interact with metallic surfaces, leading to accelerated material degradation. Commonly found in power plants, oil and gas operations, and chemical processing facilities, FAC poses significant risks to system integrity, safety, and operational efficiency. Left unaddressed, FAC can result in costly…

Rp 7.950.000
Tersedia
Index
Chat with us on WhatsApp
Chat with Us