- Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
Fiqry Jaya Manunggal - Training and Consulting Services
Welcome to PT FIQRY JAYA MANUNGGAL (FJM)
Dear Customers,
PT. Fiqry Jaya Manunggal was established in 2001 with variety of services in human resources training. These training programs range from publics to customized in-house training to meet the specific needs of our honored clients. Technical training is our main focus although soft skills, procurement & logistics and other topics are also in our radar.
Over the decade in services, FJM has enlarged the services to consulting services such as architect/fit out, graphic design & printing, and software development. Most of our clients are from oil/gas industries, power generation & mining.
We also serve on providing Health & Safety certification training issued by Kemnaker (Ministry of Human Resources) for both human resources and equipment certification. Such certificate/license has normally 3-years validity where we also serve to take care of such re-certification and extension process.
It is our commitment to provide the best services to Our Clients.
Training Terkini
Mastering Production Sharing Contract (PSC) & Project Economics
– 24 September, 2026 at Pullman Bandung Grand Central***** This course is designed so that participants can have more interactive discussions with the instructor. This two-day intensive course provides the participants with a comprehensive understanding of Production Sharing Contracts (PSC) and explain what makes Indonesian PSC different from global PSC. The discussion focus on the…
Rp 14.950.000
Contract Life Cycle Management
Background: Contract Management has become a critical business function for organizations seeking to optimize operational performance, ensure regulatory compliance, minimize contractual risks, and maximize value throughout the entire contract lifecycle. In the oil/gas, mining & capital-intensive industries, where contracts often involve high-value procurement, construction, equipment rental, engineering services, logistics, and long-term operational agreements, effective contract…
Rp 7.950.000
Membangun Kolaborasi Tim yang Solid dan Efektif di Era Hybrid Working
Artikel ini membahas strategi penting untuk membangun kolaborasi tim yang solid dan efektif di tengah tren kerja hybrid. Pelajari cara mengoptimalkan komunikasi, alat, dan budaya tim agar tetap produktif. Dapatkan panduan lengkap untuk sukses dalam lingkungan kerja fleksibel.
*Harga Hubungi CS
Membangun Growth Mindset di Era Perubahan Cepat
Artikel ini membahas pentingnya membangun growth mindset untuk menghadapi tantangan di era perubahan cepat. Temukan strategi praktis untuk beradaptasi, belajar, dan terus berkembang dalam lingkungan yang dinamis. Raih potensi terbaik Anda dengan pola pikir yang tepat.
*Harga Hubungi CS
Design Thinking dalam Engineering Project
Artikel ini membahas secara mendalam penerapan Design Thinking dalam konteks proyek engineering. Pelajari bagaimana pendekatan ini dapat meningkatkan inovasi, memecahkan masalah kompleks, dan mencapai hasil yang lebih efektif. Temukan manfaat utama serta langkah-langkah implementasinya.
*Harga Hubungi CS
Digital Engineering: Transformasi dari CAD ke BIM
Artikel ini membahas evolusi Digital Engineering, dari metode desain tradisional berbasis CAD ke implementasi Building Information Modeling (BIM) yang canggih. Pelajari bagaimana transformasi ini meningkatkan efisiensi dan kolaborasi dalam proyek-proyek modern.
*Harga Hubungi CS
Supervisi Pengoperasian Sistem BOP (Balance of Plant)
BACKGROUND: Pada pembangkit listrik tenaga uap (PLTU) berbahan bakar batu bara, areanya dikelompokkan menjadi beberapa bagian utama: Main Power Equipment, Balance of Plant (BOP), dan Coal Handling. Secara khusus, Main Power Equipment mencakup boiler, turbin, generator, transformator, dan kondensor. Sementara itu, BOP (Balance of Plant) meliputi beberapa sistem penting seperti Water Treatment Plant (MED, Mixed…
Rp 7.950.000BFPT Protection and Supervisory System
BFPT (Boiler Feed Pump Turbine) : Protection and Supervisory System Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan…
Rp 6.950.000
Engineering Cost Estimate
BACKGROUND: Definisi Cost Engineering menurut AACE (American Association of Cost Engineer) adalah “suatu bidang engineering, yang meliputi penerapan prinsip-prinsip ilmiah dan teknik, dengan menggunakan pengalaman dan pertimbangan engineering dalam masalah estimasi biaya, pengendalian biaya dan ekonomi teknik“. Pada saat cost engineering belum berkembang perhitungan biaya konstruksi selalu mengalami penyimpangan yang cukup besar. Merespon semua kondisi…
Rp 7.950.000
Engineering Economic Analysis
PENDAHULUAN: Para insinyur, manajer teknik, atau bahkan semua orang akan dihadapkan pada dua lingkungan penting yang saling berkaitan, yaitu lingkungan fisik dan lingkungan ekonomi. Pengetahuan yang baik tentang lingkungan fisik akan banyak mendasari kemampuan seseorang untuk melihat, mengidentifikasi, dan mengendalikan konsep-konsep teknis. Dengan demikian, lingkungan fisik yang ada di sekelilingnya akan bisa digiring pada suatu…
Rp 7.500.000
Rotating Equipment Operation & Maintenance
BACKGROUND: Rotating equipment is commonly used in the industry & plays a vital role in end-to-end production operations. Hence, mastering the principles of rotating equipment is very essential. Identification of failure modes & monitoring methods of failure symptoms are important as well, for establishing the most effective maintenance program. This course begins with discussing the…
Rp 7.950.000
Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization
BACKGROUND: Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process. Ideally this includes post start-up review optimization and asset integrity management to…
Rp 7.950.000
Petroleum Resources Management System
Background: The Petroleum Resources Management System (PRMS) is an internationally recognized framework used to classify, evaluate, and report petroleum resources and reserves in a consistent and transparent manner. PRMS goes beyond volumetric estimation by integrating technical maturity, commercial viability, risk, and uncertainty into a project-based decision framework. For professionals outside the subsurface discipline, PRMS provides…
*Harga Hubungi CS
Contractor Safety Management System
BACKGROUND: Contractor Safety Management System (CSMS), yaitu sistem manajemen yang dirancang untuk mengelola dan memitigasi risiko keselamatan bagi kontraktor yang bekerja di lokasi atau proyek tertentu. Dari sisi pemberi kerja (owner), owner ingin memastikan bahawa suatu pekerjaan dilaksanakan sesuai kaidah Q-HSE yang berlaku. Sehingga dibuatlah suatu standar & ketentuan yang harus dipenuhi oleh penyedia barang…
Rp 7.950.000
In Depth Project Cost, Schedule, and Risks Management for Project Professional
BACKGROUND: Effective project management is critical to the success of any project. With the increasing complexity and scale of projects, especially in industries such as oil, gas, and process industries, it is imperative for project managers and project professional to possess advanced skills in cost management, scheduling, and risk management. This training, In Depth Project…
Rp 7.950.000
Time Management and Negotiation
BACKGROUND Pengaturan waktu (Time Management) dan negosiasi yang efektif merupakan hal mendasar untuk lingkup berbagai wilayah kehidupan termasuk dalam mengaturan kerja di lingkup perusahaan. Sering terjadi permalahan timbulnya pekerjaan yang tidak dapat di selesaikan sesuai dengan tencana, hal ini bias di sebabkan oleh karena terlalu banyaknya pekerjaan atau tidak terjadualnya pekerjaan/ aktivitas. Intinya pengaturan waktu…
Rp 7.500.000
9%
Petugas Gas Tester – BNSP
Latar Belakang: Dalam operasi Migas sering ditemukan gas ikutan yang dapat menimbulkan resiko keselamatan di samping gas hasil produksi itu sendiri. Untuk itu diperlukan petugas yang dapat melakukan pengukuran & deteksi serta pengamanan area yang mempunyai sertifikat Petugas Gas Tester dari BNSP misalnya. Pelatihan ini diberikan kepada tenaga kerja untuk membekali/meningkatkan Kesadaran, Pengetahuan, Keterampilan dan Sikap seorang pekerja…
Rp 5.000.000 Rp 5.500.000
Electrical & Mechanical Safety
BACKGROUND: Sebagian besar penyebab kebakaran di perkotaan dan di berbagai perusahaan adalah karena listrik, dimana besarnya kerugian secara material selama tahun 2003 adalah sebesar Rp.23 Milyar! Hal ini merupakan kerugian yang sangat besar dan dapat terjadi di perusahaan mana saja apabila tidak memperhatikan kaidah-kaidah keamanan, khususnya dalam hal ini di bidang electrical & mechanical. Standar…
Rp 7.950.000Training Pilihan
Mungkin Anda sedang mencari training berikut ini, cek aja!
Kategori Pilihan
Sekian banyak kategori produk yang ada pada website kami, berikut ini kategori paling spesial
Our Blog
Kami menghadirkan berbagai artikel menarik dan informatif yang dirancang untuk menambah wawasan Anda. Semoga setiap tulisan yang kami sajikan dapat memberikan manfaat dan inspirasi. Selamat membaca!
Site Acceptance Test
Diposting oleh imamDengan dilakukannya Site Acceptance Test (SAT), maka end user lebih pastik bahwa Equipment atau alat siap beroperasi di site. Setelah equipment selesai diproduksi dan melewati Factory Acceptance Test (FAT), perjalanan equipment belum selesai. Equipment masih harus dikirim ke lokasi proyek, dipasang, diintegrasikan dengan sistem lain, dan dipastikan dapat berfungsi dalam kondisi aktual di site. Pada tahap inilah…
SelengkapnyaUser Acceptance Test
Diposting oleh imamUser Acceptance Test (UAT) adalah salah satu langkah untuk memastikan bahwa peralatan, barang atau sistem yang kita pesan siap digunakan oleh User. Setelah suatu sistem atau aplikasi selesai dikembangkan dan melewati berbagai pengujian teknis, masih ada satu pertanyaan penting: apakah sistem tersebut benar-benar dapat digunakan dan diterima oleh pengguna? UAT biasanya dilakukan setelah FAT (Factory Acceptance…
SelengkapnyaInspection Testing dalam FAT
Diposting oleh imamInspection dan Testing dalam FAT. Factory Acceptance Test umumnya tidak hanya terdiri dari satu jenis pengujian. Ada beberapa tahapan yang saling melengkapi dimana yang diuji mulai daro dokumentasi teknis, inspeksi, pengujian atas fungsi-fungsi yang diminta, dan uji kinerja. 1. Document Review Sebelum melakukan physical test, dokumen equipment perlu diperiksa. Contohnya: Approved drawings Datasheet Material certificate Calibration…
Selengkapnya
>

