• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
zoom preview activate zoom

Technical Projects Documents Management

Rp 7.950.000
Stok Tersedia
Kategori IT, Manajemen, Project

12 - 14 Agustus 2026, Jakarta

17 - 19 November 2026, Jakarta

Instructor: Ir. Anita Sampratiwi & Hani Hendarsih S.Hum

Tentukan pilihan yang tersedia!

Technical Projects Documents Management

BACKGROUND:

Every good project produces documentation that is well organized and easy to find. Return when information is needed to proceed to the next project phase or operation/maintenance process. It can be done manually although using software is much better. Nevertheless, it is very important that it shall exist & well managed

 

OBJECTIVES:

This is a two-day training program to improve the awareness of everyone, provide guidance & how to implement technical project documentation management which is often neglected. How proper documentation management support the life of the plant. After attending this training, participants:

  1. Will improve their awareness that project documentation is also critical aspects need attention & proper management beyond the physical achievement,
  2. Learn about document management governance, document management system & people interface from team involved in the project & post project phase,
  3. Learn to implement proper document management available, to hand over to their successor teams
  4. Will be introduced & practice using Document Management Software,

Should be able to implement better project documentation with themselves and other team member involve

 

COURSE OUTLINE:

  1. Objectives of Project Documentation
  2. Document Life cycle during Engineering Project Phases
    • Document life cycle during the process of a technical project respiratory management
    • Planning, filing procedure, Engineering Design, construction & installation phases, hand over to Operations & Facility Engineering & Maintenance,
    • Tips & Trick
  1. Information/Document Management Governance
    • Overview of governing regulations
    • Developing comprehensive planning, proper implementation & execution
    • Human resources behavior & awareness and appropriate technology (fit for purpose).
  1. Roles & Responsibilities
    • Building the Document Management (DM) Team good understanding of the overall project process, from planning to handover to Operation & FE.
    • Collaborative communication between Team DM & Team Engineers is an important factor in achieving the ultimate goals.
    • Road Map of implementation of EDMS
  1. Document Management Process
    • Selection & use of the right Document Management System (DMS)
    • Overview of the Electronic Document Management System (EDMS): functions needed & the appropriate system selection strategy
  1. Electronic Document Management System (EDMS)
    • Session-1: Explanation of the functions directly, as well as a practical simulation of using the EDMS, both from the user & administration sides
  1. Hands On/Practice of Using EDMS
    • Session-2: Practical simulation of using EDMS, both from the user & admin sides, with case examples.

ABOUT THE COURSE LEADER:

Ir. Anita Sampratiwi & Hani Hendarsih S.Hum, are practitioner in Project Documentation Management (PDM).

They started her career as a field geologist in Chevron where she dealt with bunch of geothermal & oil wells technical data & subsurface data to manage. Finishing her field assignment, she has than eventually more than 20 years of experiences in Data Management, IT, Information Management, Change Management & Communication, &Business Process improvement area. Holds extensive experiences in establishing, managing, &improving process and organization in various Departments in Indonesia & abroad. The largest project handled was developing & improving project documentations management in EPCI project in East Kalimantan starting from development drilling to EPCI to hand over to operation teams.

Technical Projects Documents Management

Produk Terkait

Piping Design and Fabrication

BACKGROUND: Sistem perpipaan (piping system) merupakan komponen penting dalam industri minyak dan gas, petrokimia, pembangkit listrik, dan industri proses lainnya. Piping Design and Fabrication (desain dan fabrikasi perpipaan) yang tepat dari sistem perpipaan sangat menentukan efisiensi, keselamatan, dan umur layanan instalasi tersebut. Oleh karena itu, pemahaman mendalam mengenai standar, perhitungan desain, pemilihan material, teknik fabrikasi,…

*Harga Hubungi CS
Tersedia

Powerful Database Analysis and Dashboard Reporting using Microsoft Excel

BACKGROUND: Proses menganalisa data dan membuat dashboard summary report dari file text hasil import aplikasi besar, seperti SAP/ERP, masih sering dilakukan dalam proses yang lama, memakan waktu berjam-jam, bahkan berhari-hari meskipun sudah menggunakan aplikasi Microsoft Excel. Padahal apabila dilakukan dengan metode yang canggih, yang sebenarnya sudah disediakan dalam Excel serta dengan penggunaan fungsi-fungsi terbarunya, pekerjaan…

Rp 6.950.000
Tersedia

Construction Completion Management System

BACKGROUND: Managing the completion phase of construction projects is a critical step in ensuring that all systems and components are installed, tested, and handed over as per the design specifications and contractual obligations. The Construction Completion Management System (CCMS) serves as a structured approach to monitor, document, and manage the transition from construction to commissioning….

Rp 7.950.000
Tersedia

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization

BACKGROUND: Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process. Ideally this includes post start-up review optimization and asset integrity management to…

Rp 7.950.000
Tersedia

Power Plant Performance Test

BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…

Rp 7.950.000
Tersedia

Contractor Safety Management System

BACKGROUND: Contractor Safety Management System (CSMS), yaitu sistem manajemen yang dirancang untuk mengelola dan memitigasi risiko keselamatan bagi kontraktor yang bekerja di lokasi atau proyek tertentu. Dari sisi pemberi kerja (owner), owner ingin memastikan bahawa suatu pekerjaan dilaksanakan sesuai kaidah Q-HSE yang berlaku. Sehingga dibuatlah suatu standar & ketentuan yang harus dipenuhi oleh penyedia barang…

Rp 7.950.000
Tersedia
Index
Chat with us on WhatsApp
Chat with Us