• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
zoom preview activate zoom

Reserves and Resources Evaluation

Rp 10.950.000
Stok Tersedia
Kategori 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi, Oil & Gas

Trainer: Prof. Dr.-Ing. Bonar Tua Halomoan Marbun

Bandung, 26-28 January, 2026
Bandung, 20-22 July, 2026
Bandung, 2-4 December, 2026

Tentukan pilihan yang tersedia!

Reserves and Resources Evaluation

BACKGROUND:

Understanding and calculating oil & gas reserves is a vital part of reserves and resources evaluation. Moreover, it is essential for asset management, investment decisions, and ensuring regulatory compliance. Therefore, this training provides a clear overview of reserves and resources definitions using SPE PRMS guidelines. In addition, it covers U.S. SEC regulations and Indonesian regulatory frameworks. As a result, participants will learn the differences between these frameworks and their real-world application.

Furthermore, the course highlights the integration of geoscience and engineering methods in reserves estimation. It also discusses ethical considerations, documentation practices, and audit processes. Through hands-on exercises, case studies, and examples, participants will strengthen their skills. Consequently, they will gain confidence to prepare, defend, and present reserves evaluations.
Finally, these evaluations will align with industry standards, regulations, and local government requirements.

OBJECTIVES:

• Interpret and apply the 2018 SPE-PRMS reserves definitions and principles.
• Interpret and apply US SEC reserves definitions under SEC reporting regulations.
• Understand applicable Indonesian regulations related to reserves reporting and evaluation.
• Generate compliant reserves estimates using deterministic and probabilistic methods.
• Analyze reserves using classical and advanced evaluation techniques (volumetric, material balance, and decline curve analysis).
• Understand the link between reserves estimation and project economics.
• Apply probabilistic methods and Monte Carlo simulation for uncertainty assessment.
• Prepare for audits, documentation, and defend reserve estimates for external and internal purposes.
• Document and defend your reserve estimates for external inspection or internal historical records
• Demonstrate the reliability of modern techniques in your reserve estimates

Course Outline

Fundamentals of Reserves & Resources
• Introduction to Resource Classification (SPE PRMS 2018)
• Overview of Reserves and Resources Categories
• Deterministic Reserves Estimation Methods:
o Analogy
o Volumetric Calculations
o Recovery Factors
• Deterministic Analysis: Field Example

Advanced Deterministic Methods & Economics
• Material Balance Analysis
• Classical Decline Curve Analysis
• Advanced Decline Curve Analysis
• Linking Reserves to Project Economics and Valuation
• Descriptive Statistics for Reserves Evaluation
• Deterministic Analysis on an Example Field
• Special topics: case studies, reserves in unconventional reservoirs and/or IOR/EOR projects, ethics

Probabilistic Methods & Uncertainty
• Basics of Probability and Probability Distributions
• Expected Value and Decision Trees
• Probabilistic Reserves Estimation Methods
Monte Carlo Simulation for Reserves Evaluation
• Case Studies: Application in Conventional & Unconventional Reservoirs
• Documentation, Ethics, and Audit Preparation (including compliance with Indonesian regulations)

About The Course Leader

Prof. Dr.-Ing. Bonar Tua Halomoan Marbun

Reserves and Resources Evaluation

Produk Terkait

Relay Protection

BACKGROUND: Relay adalah Saklar (Switch) yang dioperasikan secara listrik dan merupakan komponen Electromechanical (Elektromekanikal) yang terdiri dari 2 bagian utama yakni Elektromagnet (Coil) dan Mekanikal (seperangkat Kontak Saklar/Switch). Relay menggunakan Prinsip Elektromagnetik untuk menggerakkan Kontak Saklar sehingga dengan arus listrik yang kecil (low power) dapat menghantarkan listrik yang bertegangan lebih tinggi. Sebagai contoh, dengan Relay…

Rp 7.950.000
Tersedia

Flow & Level Custody Measurement

BACKGROUND: This course is designed to acquaint users with the problems and solutions for high accuracy transfer of liquid and gas petroleum products from supplier to customer. These needs have been brought about by major changes in manufacturing processes and because of several dramatic circumstantial changes such as: the increase in the cost of fuel…

Rp 7.950.000
Tersedia

E-Procurement Berbasis ICT

LATAR BELAKANG: e-Procurement adalah proses pengadaan barang/jasa pemerintah yang pelaksanaannya  dilakukan  secara  elektronik  yang  berbasis  web/ internet dengan memanfaatkan fasilitas teknologi komunikasi dan in-formasi yang meliputi pelelangan umum, pra-kualifikasi dan sourcing secara  elektronik  dengan  menggunakan  modul  berbasis  website. Proses Pengadaan barang dan jasa yang dilakukan dengan menggunakan e-procurement secara signifikan akan meningkatkan kinerja, efektifitas,  efisiensi, …

Rp 5.750.000
Tersedia

Integrated Production Optimization

Background & Objectives: A production system is the system that transports reservoir fluid from the subsurface to the surface and separates it into oil, gas, and water. From there the oil and gas streams are treated if necessary and prepared for sale or transport from the field. Any water produced will also treated and prepared…

Rp 8.950.000
Tersedia

Surface Wellhead System

Background The surface wellhead system plays critical role ensuring safe & efficient control of hydrocarbons from the reservoir to processing facilities. Positioned on surface, wellhead serves as the primary interface between subsurface operations & topside facilities. It provides structural and pressure control throughout the well’s life cycle. Among its key components, the Christmas tree enables…

Rp 6.350.000
Tersedia

Power Plant Performance Test

BACKGROUND: The main reasons to conduct a power plant performance test are: Identify the baseline performance of the power plant in different operating cases Quantify the prior/after performance improvement due to a major maintenance outage. Verify if the power plant meets the specifications of the applicable purchase contract, therefore if liquidated damages or “make good”…

Rp 7.950.000
Tersedia
Index
Chat with us on WhatsApp
Chat with Us