• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda
zoom preview activate zoom

Surface Wellhead System

Rp 6.350.000
Stok Tersedia
Kategori 100+ Pelatihan Engineering & Migas Profesional 2026 | Sertifikat Resmi, Oil & Gas

Trainer: Prof. Dr.-Ing. Bonar Tua Halomoan Marbun

Tentukan pilihan yang tersedia!

Surface Wellhead System

Background

The surface wellhead system plays critical role ensuring safe & efficient control of hydrocarbons from the reservoir to processing facilities. Positioned on surface, wellhead serves as the primary interface between subsurface operations & topside facilities. It provides structural and pressure control throughout the well’s life cycle. Among its key components, the Christmas tree enables operators to manage production flow, isolate the well when needed, & ensure operational integrity under varying conditions.

This training is designed to provide a thorough understanding of O/G surface wellhead systems, focusing on their design, components, O&M. This training will combine theoretical knowledge & practical insights. Participants will gain competence in identifying wellhead components, interpreting operational parameters, addressing common challenges: leaks, seal integrity issues, and SAP. By mastering these concepts, participants will enhance their ability to maintain well safety, extend equipment life, and support overall production efficiency.

This 2-day intensive Xmas Trees and Well Heads Operation and Testing training course will highlight:
• All components of a Well Head and of a Xmas Tree and installation sequence
• Investigation, mitigation and cure of SAP Pressures (Surface Annulus Pressure).
• Casing and Tubing Seals (monitoring and leak repairs)
• Different Causes of SAP Pressures.
Hazards originated by faulty wellheads (and their mitigation)

By the end of this training course, participants will learn to:
• Develop the knowledge relationship between surface (Well Heads) and downhole.
• Investigate leaks and identify cause of leak
• Determine Tubing pressures (based on depth of perfs, density of fluid and BHFP).
• Investigate SAP pressures based on well pressure monitoring using 2 and 3 pen recorders.
• Explain influence of corrosion models on MAASP pressures and on Well Life Cycle

Course Outline

Day-1: Surface and Subsurface Wellhead Systems
• Surface wellhead and christmas tree
• Casing string
• Surface wellhead system
• Wellhead subsystem components
Participants will be exposed to the basics of the wellhead subsystem. This includes the casing and coil tubing as well as the general arrangement of the production drill string. In addition, participants will explore the requirements of the casing and tubing string needed to connect the christmas tree.

Day-2: Surface Christmas Tree
• System and valves
• Christmas tree wellhead common components
• Christmas tree operation and controls
To expose to the basics of the christmas tree, its operation, and its valve arrangement. Participants will be introduced to the associate equipment, as well as the piping required to attach the christmas tree to the wellhead. Hydraulic control systems required to operate the automatic valves on the christmas tree.

About The Course Leader

Prof. Dr.-Ing. Bonar Tua Halomoan Marbun

Surface Wellhead System

Produk Terkait

Basic Process Safety for Operation Personnel

Background Industri proses seperti migas, petrokimia, pembangkit, dan manufaktur kimia memiliki potensi bahaya tinggi akibat penggunaan fluida berbahaya, tekanan dan temperatur tinggi, serta sistem operasi yang kompleks. Banyak kecelakaan besar di industri proses terjadi bukan hanya karena kegagalan peralatan, tetapi juga akibat kurangnya pemahaman personel operasi terhadap prinsip dasar process safety. Process safety berbeda dengan…

Rp 7.950.000
Tersedia

Instrumentation, Electrical and Control System

BACKGROUND: Covers the principles of industrial instrumentation, sensor, signal transmission, interfacing, actuator, process control, the operation of basic PID Controller on PLC and DCS. Describe the electronics of instrument, interface device and controller. Also provides the usually found advanced PID configuration in industrial systems. Simple method for PID controller tuning is also discussed. OBJECTIVES: After…

Rp 7.950.000
Tersedia

Lock Out Tag Out (LOTO)

BACKGROUND: Tag Out & Lock Out (LOTO) adalah prosedur keselamatan kerja yang bertujuan untuk melindungi pekerja dari potensi bahaya akibat pelepasan energi yang tidak terduga saat melakukan perawatan atau perbaikan peralatan. LOTO tidak hanya berlaku untuk tim Electrical, tetapi juga penting bagi tim Production, Operation, Maintenance, dan Instrument, karena setiap sistem dalam industri Oil &…

Rp 7.950.000
Tersedia

Taxation, Legal and Financial Aspects of PSC

BACKGROUND: Taxation, Legal, and Financial Aspects of Production Sharing Contracts (PSC) focuses on equipping participants with a comprehensive understanding of the complex tax regulations and legal frameworks governing PSCs in Indonesia. As one of the primary models for oil and gas exploration and production, PSCs involve intricate financial structures, cost recovery mechanisms, and tax obligations…

Rp 14.500.000
Tersedia

Hazardous Area Classification & Installation

LATAR BELAKANG: Kawasan berbahaya didefinisikan dalam DSEAR (Dangerous Substances and Explosive Atmospheres Regulation) sebagai “setiap tempat di mana atmosfer yang mudah meledak dapat terjadi dalam jumlah yang memerlukan tindakan pencegahan khusus untuk melindungi keselamatan pekerja”. Dalam konteks ini, ‘tindakan pencegahan khusus’ sebaiknya diambil sehubungan dengan konstruksi, pemasangan dan penggunaan peralatan. Oleh karena itu Hazardous Area…

Rp 7.950.000
Tersedia

Applied Reservoir Engineering

BACKGROUND: Petroleum Engineering practically covers: Production Operation, Drilling, and the core (Reservoir Engineering). This training represents the core of the reservoir engineering program. Numerous engineering practices are covered from fluid & rock properties to simulation & field development planning. As the core, Reservoir Department is the only one that normally cares about the live time…

Rp 10.950.000
Tersedia
Index
Chat with us on WhatsApp
Chat with Us