• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda

Fiqry Jaya Manunggal - Training and Consulting Services

Welcome to PT FIQRY JAYA MANUNGGAL (FJM)

 

Dear Customers,

PT. Fiqry Jaya Manunggal was established in 2001 with variety of services in human resources training. These training programs range from publics to customized in-house training to meet the specific needs of our honored clients. Technical training is our main focus although soft skills, procurement & logistics and other topics are also in our radar.

Over the decade in services, FJM has enlarged the services to consulting services such as architect/fit outgraphic design & printing, and software development. Most of our clients are from oil/gas industries, power generation & mining.

We also serve on providing Health & Safety certification training issued by Kemnaker (Ministry of Human Resources) for both human resources and equipment certification. Such certificate/license has normally 3-years validity where we also serve to take care of such re-certification and extension process.

It is our commitment to provide the best services to Our Clients.

 

Training Terkini

Mastering Production Sharing Contract (PSC) & Project Economics

– 24 September, 2026 at Pullman Bandung Grand Central***** This course is designed so that participants can have more interactive discussions with the instructor. This two-day intensive course provides the participants with a comprehensive understanding of Production Sharing Contracts (PSC) and explain what makes Indonesian PSC different from global PSC. The discussion focus on the…

Rp 14.950.000
Tersedia

Contract Life Cycle Management

Background: Contract Management has become a critical business function for organizations seeking to optimize operational performance, ensure regulatory compliance, minimize contractual risks, and maximize value throughout the entire contract lifecycle. In the oil/gas, mining & capital-intensive industries, where contracts often involve high-value procurement, construction, equipment rental, engineering services, logistics, and long-term operational agreements, effective contract…

Rp 7.950.000
Tersedia

Membangun Kolaborasi Tim yang Solid dan Efektif di Era Hybrid Working

Artikel ini membahas strategi penting untuk membangun kolaborasi tim yang solid dan efektif di tengah tren kerja hybrid. Pelajari cara mengoptimalkan komunikasi, alat, dan budaya tim agar tetap produktif. Dapatkan panduan lengkap untuk sukses dalam lingkungan kerja fleksibel.

*Harga Hubungi CS

Membangun Growth Mindset di Era Perubahan Cepat

Artikel ini membahas pentingnya membangun growth mindset untuk menghadapi tantangan di era perubahan cepat. Temukan strategi praktis untuk beradaptasi, belajar, dan terus berkembang dalam lingkungan yang dinamis. Raih potensi terbaik Anda dengan pola pikir yang tepat.

*Harga Hubungi CS

Design Thinking dalam Engineering Project

Artikel ini membahas secara mendalam penerapan Design Thinking dalam konteks proyek engineering. Pelajari bagaimana pendekatan ini dapat meningkatkan inovasi, memecahkan masalah kompleks, dan mencapai hasil yang lebih efektif. Temukan manfaat utama serta langkah-langkah implementasinya.

*Harga Hubungi CS

Digital Engineering: Transformasi dari CAD ke BIM

Artikel ini membahas evolusi Digital Engineering, dari metode desain tradisional berbasis CAD ke implementasi Building Information Modeling (BIM) yang canggih. Pelajari bagaimana transformasi ini meningkatkan efisiensi dan kolaborasi dalam proyek-proyek modern.

*Harga Hubungi CS

Supervisi Pengoperasian Sistem BOP (Balance of Plant)

BACKGROUND: Pada pembangkit listrik tenaga uap (PLTU) berbahan bakar batu bara, areanya dikelompokkan menjadi beberapa bagian utama: Main Power Equipment, Balance of Plant (BOP), dan Coal Handling. Secara khusus, Main Power Equipment mencakup boiler, turbin, generator, transformator, dan kondensor. Sementara itu, BOP (Balance of Plant) meliputi beberapa sistem penting seperti Water Treatment Plant (MED, Mixed…

Rp 7.950.000
Tersedia

BFPT Protection and Supervisory System

BFPT (Boiler Feed Pump Turbine) : Protection and Supervisory System Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan…

Rp 6.950.000
Tersedia

Engineering Cost Estimate

BACKGROUND: Definisi Cost Engineering menurut AACE (American Association of Cost Engineer) adalah “suatu bidang engineering, yang meliputi penerapan prinsip-prinsip ilmiah dan teknik, dengan menggunakan pengalaman dan pertimbangan engineering dalam masalah estimasi biaya, pengendalian biaya dan ekonomi teknik“. Pada saat cost engineering belum berkembang perhitungan biaya konstruksi selalu mengalami penyimpangan yang cukup besar. Merespon semua kondisi…

Rp 7.950.000
Tersedia

Engineering Economic Analysis

PENDAHULUAN: Para insinyur, manajer teknik, atau bahkan semua orang akan dihadapkan pada dua lingkungan penting yang saling berkaitan, yaitu lingkungan fisik dan lingkungan ekonomi. Pengetahuan yang baik tentang lingkungan fisik akan banyak mendasari kemampuan seseorang untuk melihat, mengidentifikasi, dan mengendalikan konsep-konsep teknis. Dengan demikian, lingkungan fisik yang ada di sekelilingnya akan bisa digiring pada suatu…

Rp 7.500.000
Tersedia

Rotating Equipment Operation & Maintenance

BACKGROUND: Rotating equipment is commonly used in the industry & plays a vital role in end-to-end production operations. Hence, mastering the principles of rotating equipment is very essential. Identification of failure modes & monitoring methods of failure symptoms are important as well, for establishing the most effective maintenance program. This course begins with discussing the…

Rp 7.950.000
Tersedia

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization

BACKGROUND: Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process. Ideally this includes post start-up review optimization and asset integrity management to…

Rp 7.950.000
Tersedia

In Depth Project Cost, Schedule, and Risks Management for Project Professional

BACKGROUND: Effective project management is critical to the success of any project. With the increasing complexity and scale of projects, especially in industries such as oil, gas, and process industries, it is imperative for project managers and project professional to possess advanced skills in cost management, scheduling, and risk management. This training, In Depth Project…

Rp 7.950.000
Tersedia

BOILER (Pulverizer & Soot blower System)

BACKGROUND: Pada Pembangkit Listrik Tenaga Uap (PLTU) berbahan bakar Batu Bara, Soot Blower dan Pulverizer merupakan alat-alat yang sangat penting. Soot blower berfungsi untuk membersihkan tube pada boiler pada Heat Recovery Area (HRA) yaitu area Superheater, Economizer, Reheat, serta pada Air Heater dari kotoran/slag yang menempel. Sedangkan Pulverizer merupakan penyedia serbuk bahan bakar batu bara…

Rp 7.950.000
Tersedia

Process Safety & Asset Integrity Management System

Background: Process Safety & Asset Intergrity Management System, biasanya merupakan dua hal yang terpisah. Padahal keselamatan proses (Process Safety) dan integritas aset (Asset Integrity) merupakan fondasi utama dalam industri migas yang berisiko tinggi. Kegagalan pengelolaan kedua aspek ini bisa menimbulkan kerugian besar, baik dari sisi manusia, lingkungan, maupun bisnis. Process Safety & Asset Integrity Management…

Rp 7.950.000
Tersedia

Advance Electrical Power Distribution & Protection System

Background: Sistem distribusi dan proteksi tenaga listrik merupakan tulang punggung keandalan operasi industri dan fasilitas pembangkitan. Electrical Power Distribution & Protection System berfungsi menyalurkan energi listrik secara aman, efisien, dan kontinu dari sumber ke berbagai beban. Keandalan sistem ini sangat bergantung pada kemampuan design engineer, operator, dan electrical engineer dalam memahami karakteristik beban, parameter sistem,…

*Harga Hubungi CS
Tersedia

API 580 Risk Based Inspection

API 580 – Risk Based Inspection and Maintenance, Repair Background Dalam industri proses berisiko tinggi, kegagalan peralatan seperti pressure vessel, piping, heat exchanger, dan storage tank dapat menimbulkan dampak serius terhadap keselamatan, lingkungan, dan kontinuitas operasi. Pendekatan inspeksi konvensional berbasis waktu (time-based inspection) sering kali tidak efektif dan kurang optimal dari sisi biaya dan risiko….

Rp 7.950.000
Tersedia

Drilling Problem Analysis

BACKGROUND: Pengeboran sumur minyak dan gas sering kali menghadapi tantangan yang tidak terduga, meskipun telah dilakukan perencanaan yang matang. Drilling Problem Analysis adalah kunci keberhasilan operasi pengeboran, yang melibatkan kemampuan untuk mengidentifikasi dan mengantisipasi potensi masalah serta merancang program pengeboran yang efektif. Pelatihan ini dirancang untuk membekali peserta dengan pengetahuan mendalam tentang analisis masalah pengeboran,…

Rp 14.950.000
Tersedia

Training Pilihan

Mungkin Anda sedang mencari training berikut ini, cek aja!

Kategori Pilihan

Sekian banyak kategori produk yang ada pada website kami, berikut ini kategori paling spesial

Our Blog

Kami menghadirkan berbagai artikel menarik dan informatif yang dirancang untuk menambah wawasan Anda. Semoga setiap tulisan yang kami sajikan dapat memberikan manfaat dan inspirasi. Selamat membaca!

Site Acceptance Test

Diposting oleh imam

Dengan dilakukannya Site Acceptance Test (SAT), maka end user lebih pastik bahwa Equipment atau alat siap beroperasi di site. Setelah equipment selesai diproduksi dan melewati Factory Acceptance Test (FAT), perjalanan equipment belum selesai. Equipment masih harus dikirim ke lokasi proyek, dipasang, diintegrasikan dengan sistem lain, dan dipastikan dapat berfungsi dalam kondisi aktual di site. Pada tahap inilah…

Selengkapnya
23 Aug

User Acceptance Test

Diposting oleh imam

User Acceptance Test (UAT) adalah salah satu langkah untuk memastikan bahwa peralatan, barang atau sistem yang kita pesan siap digunakan oleh User. Setelah suatu sistem atau aplikasi selesai dikembangkan dan melewati berbagai pengujian teknis, masih ada satu pertanyaan penting: apakah sistem tersebut benar-benar dapat digunakan dan diterima oleh pengguna? UAT biasanya dilakukan setelah FAT (Factory Acceptance…

Selengkapnya
18 Aug

Inspection Testing dalam FAT

Diposting oleh imam

Inspection dan Testing dalam FAT. Factory Acceptance Test umumnya tidak hanya terdiri dari satu jenis pengujian. Ada beberapa tahapan yang saling melengkapi dimana yang diuji mulai daro dokumentasi teknis, inspeksi, pengujian atas fungsi-fungsi yang diminta, dan uji kinerja. 1. Document Review Sebelum melakukan physical test, dokumen equipment perlu diperiksa. Contohnya: Approved drawings Datasheet Material certificate Calibration…

Selengkapnya