• Selamat datang di website PT Fiqry Jaya Manunggal. Semoga anda senantiasa sehat afiat. Kami siap melayani anda

Fiqry Jaya Manunggal - Training and Consulting Services

Welcome to FJM (PT Fiqry Jaya Manunggal)

 

Dear Customers,

PT. Fiqry Jaya Manunggal was established in 2001 with variety of services in human resources training. These training programs range from publics to customized in-house training to meet the specific needs of our honored clients. Technical training is our main focus although soft skills, procurement & logistics and other topics are also in our radar.

Over the decade in services, FJM has enlarged the services to consulting services such as architect/fit outgraphic design & printing, and software development. Most of our clients are from oil/gas industries, power generation & mining.

We also serve on providing Health & Safety certification training issued by Kemnaker (Ministry of Human Resources) for both human resources and equipment certification. Such certificate/license has normally 3-years validity where we also serve to take care of such re-certification and extension process.

It is our commitment to provide the best services to Our Clients.

 

Training Terkini

Stuck Pipe Prevention

Background: Stuck pipe is one of the most critical and costly problems in drilling operations across the Oil & Gas and Geothermal industries. With more complex well trajectories, smaller hole sizes, and an industry push to “drill to the limit,” the risk of stuck pipe incidents has grown significantly. Although rigs are now supported by…

*Harga Hubungi CS
Tersedia

Sand Control Management

BACKGROUND: In oil & gas production, sand production remains a critical issue can significantly impact equipment integrity, production efficiency, & overall operational safety. If not properly managed, produced sand can lead to severe erosion of equipment, flow restrictions, & even complete system failures. Hence, effective sand control management is essential to ensuring long-term well productivity…

*Harga Hubungi CS
Tersedia

Marginal Fields Development

Background: Marginal fields development refers to discoveries which have not been exploited for long, due to one or more of the following factors: • Very small sizes of reserves/pool to the extent of not being economically viable • Lack of infrastructure in the vicinity and profitable consumers • Prohibitive development costs, fiscal levies and or…

*Harga Hubungi CS
Tersedia

Integrated Reservoir Management

Background: Integrated Reservoir Management (IRM) is a structured approach to maximize the value of hydrocarbon assets by combining G&G, Reservoir Engineering, Drilling, Completion, Production, and Economic considerations into a single framework. Through effective integration of data and disciplines, operators can improve recovery factors, extend field life, and optimize development plans. This is where “Integrated” play…

*Harga Hubungi CS
Tersedia

Piping Design and Fabrication

BACKGROUND: Sistem perpipaan (piping system) merupakan komponen penting dalam industri minyak dan gas, petrokimia, pembangkit listrik, dan industri proses lainnya. Piping Design and Fabrication (desain dan fabrikasi perpipaan) yang tepat dari sistem perpipaan sangat menentukan efisiensi, keselamatan, dan umur layanan instalasi tersebut. Oleh karena itu, pemahaman mendalam mengenai standar, perhitungan desain, pemilihan material, teknik fabrikasi,…

*Harga Hubungi CS
Tersedia

Deklarasi Kondisi Indeks Kinerja Pembangkit

BACKGROUND: Deklarasi Kondisi Indeks Kinerja Pembangkit adalah bagian penting dalam manajemen operasi pembangkit untuk menjaga keandalan. DKIKP berfungsi memastikan efisiensi dan akuntabilitas kinerja pembangkit melalui standar yang jelas dan terukur. Dokumen ini menjadi acuan dalam pelaporan kondisi teknis dan operasional pembangkit. DKIKP juga menjadi dasar evaluasi capaian kinerja pembangkit terhadap target perusahaan dan regulator. Pemahaman…

*Harga Hubungi CS
Tersedia

Supervisi Pengoperasian Sistem BOP (Balance of Plant)

BACKGROUND: Pada pembangkit listrik tenaga uap (PLTU) berbahan bakar batu bara, areanya dikelompokkan menjadi beberapa bagian utama: Main Power Equipment, Balance of Plant (BOP), dan Coal Handling. Secara khusus, Main Power Equipment mencakup boiler, turbin, generator, transformator, dan kondensor. Sementara itu, BOP (Balance of Plant) meliputi beberapa sistem penting seperti Water Treatment Plant (MED, Mixed…

Rp 7.950.000
Tersedia

Engineering Cost Estimate

BACKGROUND: Definisi Cost Engineering menurut AACE (American Association of Cost Engineer) adalah “suatu bidang engineering, yang meliputi penerapan prinsip-prinsip ilmiah dan teknik, dengan menggunakan pengalaman dan pertimbangan engineering dalam masalah estimasi biaya, pengendalian biaya dan ekonomi teknik“. Pada saat cost engineering belum berkembang perhitungan biaya konstruksi selalu mengalami penyimpangan yang cukup besar. Merespon semua kondisi…

Rp 7.950.000
Tersedia

Rotating Equipment Operation & Maintenance

BACKGROUND: Rotating equipment is commonly used in the industry & plays a vital role in end-to-end production operations. Hence, mastering the principles of rotating equipment is very essential. Identification of failure modes & monitoring methods of failure symptoms are important as well, for establishing the most effective maintenance program. This course begins with discussing the…

Rp 7.950.000
Tersedia

Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization

BACKGROUND: Onshore Facilities Infrastructure, Design, Constructions & Operation Optimization are one of the most complex systems among others. It requires team competent in fully integrated approaches starting from initial study, design planning, construction, startup operation and carry on to the post commissioning process. Ideally this includes post start-up review optimization and asset integrity management to…

Rp 7.950.000
Tersedia

BFPT Protection and Supervisory System

BFPT (Boiler Feed Pump Turbine) : Protection and Supervisory System Boiler Feed Pump Turbine (BFPT) adalah komponen penting dalam operasi boiler uap, berfungsi untuk memompa air umpan ke dalam boiler. Pompa air umpan ini bekerja dengan mengambil isapan dari sistem pengembalian kondensat dan memompa air bertekanan tinggi, baik berupa air baru maupun kondensat yang dihasilkan…

Rp 6.950.000
Tersedia

BOILER (Pengoperasian Burner System: Coal, Main Oil Gun, Tiny Oil Gun)

BACKGROUND: Pada Pembangkit berbahan bakar batubara, proses start awal boiler tidak bisa langsung menggunakan batubara karena temperatur di furnace masih rendah. Untuk menaikkan temperatur furnace maka digunakan bahan bakar HSD (High Speed Diesel) melalui alat main oil gun. Pada main oil gun terdapat dua saluran utama yaitu saluran bahan bakar HSD dan saluran atomizing air….

Rp 7.950.000
Tersedia

Piping Design and Fabrication

BACKGROUND: Sistem perpipaan (piping system) merupakan komponen penting dalam industri minyak dan gas, petrokimia, pembangkit listrik, dan industri proses lainnya. Piping Design and Fabrication (desain dan fabrikasi perpipaan) yang tepat dari sistem perpipaan sangat menentukan efisiensi, keselamatan, dan umur layanan instalasi tersebut. Oleh karena itu, pemahaman mendalam mengenai standar, perhitungan desain, pemilihan material, teknik fabrikasi,…

*Harga Hubungi CS
Tersedia

Fundamental Machine Learning

Fundamental Machine Learning A-Z: Hands-on Python & R in Data Science BACKGROUND: Di era digital, penguasaan Machine Learning bukan lagi pilihan. Seperti kita ketahui saat ini ada demikian banyak bahasa pemrogram komputer. Ini adalah kebutuhan strategis untuk tetap relevan dalam dunia data. Pelatihan ini dirancang komprehensif agar peserta memiliki pondasi kuat pada konsep inti Machine…

Rp 6.500.000
Tersedia

RAM (Reliability, Availability, and Maintainability)

BACKGROUND: Studi RAM digunakan sebagai cara untuk menilai kemampuan sistem produksi (plant), baik yang beroperasi maupun yang masih dalam fase desain. Karena fasilitas & plant digunakan untuk jangka waktu yang lebih lama, Studi Reliability, Availability, dan Maintainability mampu memberikan assessment ke dalam asset life time capabilities & memungkinkan bisnis untuk memaksimalkan laba atas investasi. RAM…

Rp 7.950.000
Tersedia
Diskon
4%

Operator Scafolding – BNSP

Latar Belakang: Bekerja di atas perancah mengandung resiko terhadap keselamatan diri sendiri & orang lain. Oleh karena itu seseorang yang bertanggung jawab terhadap pemasangan dan operasi scafolding wajib berkompeten sebagai Operator Scaffolding dan bersertifikat misalnya dari BNSP. Pelatihan ini diberikan kepada tenaga kerja untuk membekali/meningkatkan Kesadaran, Pengetahuan, Keterampilan dan Sikap seorang pekerja agar dapat: Menerapkan peraturan perundang-undangan yang…

Rp 6.000.000 Rp 6.250.000
Tersedia

Safety Instrumented System (SIS) and Control

BACKGROUND: Process safety is a critical element in industries involving high-risk operations, such as oil and gas, petrochemicals, and manufacturing. One of the main components in process safety management is the Safety Instrumented System (SIS). SIS is designed to protect personnel, the environment, and assets from potential incidents that can cause significant losses. This training…

Rp 7.950.000
Tersedia

Project Control and Scheduling Using MS Project

BACKGROUND: Aktivitas proyek dapat terjadi di segala bidang di perusahaan, baik proyek fisik (infrastruktur) seperti proyek pembelian peralatan, pemasangan fasilitas, pendirian pabrik baru maupun non fisik seperti proyek pengembangan produk baru,perancangan struktur organisasi, pembuatan sistem informasi manajemen dan peningkatan produktivitas perusahaan. Realitas di lapangan menunjukkan bahwa sering terjadi kegagalan dalam menjalankan proyek disebabkan oleh adanya…

Rp 7.950.000
Tersedia

Training Pilihan

Mungkin Anda sedang mencari training berikut ini, cek aja!

Kategori Pilihan

Sekian banyak kategori produk yang ada pada website kami, berikut ini kategori paling spesial

Our Blog

Kami menghadirkan berbagai artikel menarik dan informatif yang dirancang untuk menambah wawasan Anda. Semoga setiap tulisan yang kami sajikan dapat memberikan manfaat dan inspirasi. Selamat membaca!

Pola Pikir Kaya Miskin

Diposting oleh Teguh Imam Santoso

Pola Pikir Kaya vs Miskin: Rahasia Mengubah Mindset untuk Sukses dalam kehidupan. Dalam realitas sehari-hari, sering kita dengar istilah mindset kaya dan mindset miskin. Istilah ini bukan sekadar membedakan orang yang memiliki banyak harta dengan yang tidak, melainkan bagaimana cara seseorang berpikir, mengambil keputusan, dan memandang peluang. Pola pikir adalah fondasi utama yang menentukan apakah…

Selengkapnya
6 Oct

Safety dalam Shutdown Maintenance

Diposting oleh admin

Safety dalam Shutdown Maintenance: Menjaga Keselamatan di Tengah Kompleksitas Proyek Shutdown maintenance adalah kegiatan penghentian operasi pabrik atau fasilitas industri untuk melakukan perawatan menyeluruh, inspeksi, penggantian komponen, hingga upgrade sistem. Aktivitas ini sangat penting untuk menjamin keberlanjutan operasional jangka panjang. Namun, shutdown juga dikenal sebagai fase dengan risiko keselamatan tertinggi, karena melibatkan banyak pekerja, aktivitas…

Selengkapnya
4 Oct

Incident Investigation: Teknik Root Cause Analysis

Diposting oleh admin

Pendahuluan Dalam penerapan K3/HSE, setiap insiden kerja—baik kecelakaan, kerusakan peralatan, maupun near miss—harus diinvestigasi secara menyeluruh. Tujuannya bukan mencari siapa yang salah, melainkan mengidentifikasi akar penyebab (root cause) dan memastikan tindakan pencegahan dilakukan agar kejadian serupa tidak terulang. Metode yang banyak digunakan adalah Root Cause Analysis (RCA), yaitu pendekatan sistematis untuk menemukan penyebab mendasar di…

Selengkapnya
2 Oct

Fiqry Jaya Manunggal - Training and Consulting Services

Fiqry Jaya Manunggal - Training and Consulting Services